5 - 40
CHAS
HANDLEBAR
EC5B0000
HANDLEBAR
Extent of removal:
1
Handlebar removal
Extent of removal
Order
Part name
Q’ty
Remarks
Preparation for removal
HANDLEBAR REMOVAL
Headlight
1
Hot starter cable
1
Disconnect at the lever side.
2
Hot starter lever holder
1
3
Clutch cable
1
Disconnect at the lever side.
4
Clutch lever holder
1
Disconnect the clutch switch lead.
5
Engine stop switch
1
Disconnect the engine stop switch lead.
6
Light switch
1
7
Brake master cylinder
1
Refer to “REMOVAL POINTS”.
8
Start switch
1
Disconnect the start switch lead.
9
Throttle cable cap
1
10
Throttle cable #2 (pushed)
1
Disconnect at the throttle side.
11
Throttle cable #1 (pulled)
1
Disconnect at the throttle side.
12
Right grip
1
Refer to “REMOVAL POINTS”.
13
Tube guide
1
14
Grip cap cover
1
15
Left grip
1
Refer to “REMOVAL POINTS”.
16
Handlebar upper holder
2
17
Handlebar
1
1
www.PlanDeGraissage.org
Содержание WR250FR 2002
Страница 1: ...LIT 11626 16 48 WR250FR 5UM 28199 10 OWNER S SERVICE MANUAL www PlanDeGraissage org...
Страница 2: ...www PlanDeGraissage org...
Страница 5: ...www PlanDeGraissage org...
Страница 12: ...MEMO www PlanDeGraissage org...
Страница 118: ...3 53 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a variable voltage charger www PlanDeGraissage org...
Страница 119: ...3 54 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a constant voltage charger www PlanDeGraissage org...
Страница 143: ...4 21 ENG 9 Install Clamp 1 Refer to CABLE ROUTING DIAGRAM section in the CHAPTER 2 1 CARBURETOR www PlanDeGraissage org...