4 - 72
ENG
KICK SHAFT AND SHIFT SHAFT
KICK SHAFT AND SHIFT SHAFT
Extent of removal:
1
Kick shaft removal
2
Kick shaft disassembly
3
Shift shaft removal
4
Segment removal
Extent of removal
Order
Part name
Q’ty
Remarks
KICK SHAFT AND SHIFT
SHAFT REMOVAL
Preparation for removal
Oil pump
Refer to “OIL PUMP” section.
1
Kick idle gear
1
2
Kick shaft assembly
1
Refer to “REMOVAL POINTS”.
3
Spring guide
1
4
Torsion spring
1
5
Ratchet wheel
1
6
Kick gear
1
7
Kick shaft
1
8
Washer
1
9
Shift pedal
1
10
Shift shaft
1
11
Collar
1
3
2
1
4
1
www.PlanDeGraissage.org
Содержание WR250FR 2002
Страница 1: ...LIT 11626 16 48 WR250FR 5UM 28199 10 OWNER S SERVICE MANUAL www PlanDeGraissage org...
Страница 2: ...www PlanDeGraissage org...
Страница 5: ...www PlanDeGraissage org...
Страница 12: ...MEMO www PlanDeGraissage org...
Страница 118: ...3 53 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a variable voltage charger www PlanDeGraissage org...
Страница 119: ...3 54 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a constant voltage charger www PlanDeGraissage org...
Страница 143: ...4 21 ENG 9 Install Clamp 1 Refer to CABLE ROUTING DIAGRAM section in the CHAPTER 2 1 CARBURETOR www PlanDeGraissage org...