CYLINDER HEAD
5-10
2. Check:
• Cylinder head
Damage/scratches
→
Replace.
• Cylinder head water jacket
Mineral deposits/rust
→
Eliminate.
3. Measure:
• Cylinder head warpage
Out of specification
→
Resurface the cylinder
head.
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Place a straightedge “1” and a thickness
gauge “2” across the cylinder head.
b. Measure the warpage.
c. If the limit is exceeded, resurface the cylinder
head as follows.
d. Place a 400–600 grit wet sandpaper on the
surface plate and resurface the cylinder head
using a figure-eight sanding pattern.
TIP
To ensure an even surface, rotate the cylinder
head several times.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
EAS22B1004
CHECKING THE CAMSHAFT SPROCKET
AND TIMING CHAIN GUIDE
1. Check:
• Camshaft sprocket
More than 1/4 tooth wear “a”
→
Replace the
camshaft sprocket, timing chain and crank-
shaft as a set.
2. Check:
• Timing chain guide (exhaust side)
Damage/wear
→
Replace.
EAS24200
CHECKING THE TIMING CHAIN TENSIONER
1. Check:
• Timing chain tensioner
Cracks/damage/rough movement
→
Re-
place.
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Remove the timing chain tensioner cap.
b. While lightly pressing the timing chain ten-
sioner rod by hand, turn it clockwise with a
thin screwdriver “1” until it stops.
c. Remove the screwdriver and slowly release
the timing chain tensioner rod.
Warpage limit
0.03 mm (0.0012 in)
a. 1/4 tooth
b. Correct
1. Timing chain roller
2. Camshaft sprocket
1
Содержание WR125R 2009
Страница 1: ...2009 SERVICE MANUAL WR125R WR125X 22B F8197 E0 ...
Страница 6: ......
Страница 8: ......
Страница 24: ...SPECIAL TOOLS 1 15 ...
Страница 51: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 26 ...
Страница 54: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 EAS20410 LUBRICATION DIAGRAMS A 1 4 5 6 7 2 3 ...
Страница 56: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 1 3 2 4 ...
Страница 57: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 32 1 Camshaft 2 Crankshaft 3 Main axle 4 Drive axle ...
Страница 58: ...COOLING SYSTEM DIAGRAMS 2 33 EAS20420 COOLING SYSTEM DIAGRAMS 9 1 2 6 7 8 3 5 4 ...
Страница 64: ...CABLE ROUTING 2 39 D D D D B C C B A A E D D C C B B A A E B F A E C D 1 2 1 1 1 5 7 6 4 3 8 8 7 5 4 3 ...
Страница 66: ...CABLE ROUTING 2 41 A A B B C C A A B B A B C E D 1 2 3 4 5 6 7 8 9 12 10 11 14 13 ...
Страница 68: ...CABLE ROUTING 2 43 B B C C A A A B B C C A A B C C 1 2 3 4 3 4 5 6 7 8 9 10 11 ...
Страница 72: ...CABLE ROUTING 2 47 A A C C B B A A B C C B A B E C D 1 2 3 4 5 7 8 9 6 5 6 17 18 12 13 14 14 19 15 16 10 11 ...
Страница 78: ...CABLE ROUTING 2 53 ...
Страница 81: ......
Страница 109: ...ELECTRICAL SYSTEM 3 28 1 a b ...
Страница 110: ...ELECTRICAL SYSTEM 3 29 ...
Страница 113: ......
Страница 142: ...FRONT BRAKE 4 29 Refer to BLEEDING THE HYDRAULIC BRAKE SYSTEM on page 3 19 ...
Страница 184: ...CHAIN DRIVE 4 71 ...
Страница 248: ...CRANKCASE 5 61 A Left crankcase B Right crankcase A 1 7 11 12 3 14 2 13 4 5 6 8 9 10 16 15 B ...
Страница 258: ...TRANSMISSION 5 71 ...
Страница 277: ...THROTTLE BODY 7 8 ...
Страница 278: ...AIR INDUCTION SYSTEM 7 9 EAS27040 AIR INDUCTION SYSTEM 2 1 3 ...
Страница 282: ...AIR INDUCTION SYSTEM 7 13 ...
Страница 285: ......
Страница 295: ...ELECTRIC STARTING SYSTEM 8 10 ...
Страница 297: ...CHARGING SYSTEM 8 12 2 AC magneto 4 Rectifier regulator 5 Main fuse 6 Battery ...
Страница 299: ...CHARGING SYSTEM 8 14 ...
Страница 313: ...COOLING SYSTEM 8 28 ...
Страница 343: ...FUEL PUMP SYSTEM 8 58 ...
Страница 369: ......
Страница 370: ......