Pre-operation checks
74
Securely install the stern drain plugs by tight-
ening them until they stop.
EJU41441
Hood check
Push down on the rear of the hood and make
sure that it is securely closed.
EJU40146
Post-launch checks
Perform the post-launch checks in the pre-
operation checklist while the watercraft is in
the water and the engine is running.
To perform the post-launch checks:
(1) Launch the watercraft. (See page 78 for
information on launching the watercraft.)
(2) Perform the checks and make sure that
there are no malfunctioning items or oth-
er problems.
EJU41811
Cooling water pilot outlet check
Make sure that water is discharged from the
port (left) cooling water pilot outlet while the
engine is running. (See page 31 for informa-
tion on the cooling water pilot outlets.)
EJU32715
Multifunction information center check
Make sure that the multifunction information
center operates properly. (See page 40 for in-
1
Stern drain plug
1
UF3J71E0.book Page 74 Friday, June 27, 2014 1:50 PM