SPEC
51
PZ50VTA
Clamp the headlight lead to the
inside of the shroud frame.
Shroud stopper
Shroud frame
Headlight lead
Clamp the headlight lead at the
white tape to the shroud frame
with the clamp, making sure to
position the clamp near the
bracket.
Clamp the headlight lead to the
shroud frame with the clamp,
making sure to route the lead
along the bend in the frame.
CABLE ROUTING
Содержание Phazer Venture Lite PZ50MTA 2011
Страница 1: ......
Страница 2: ......
Страница 8: ......
Страница 18: ...FI 9 WIRING DIAGRAM PZ50GTA PZ50RTA PZ50MTA FUEL INJECTION SYSTEM ...
Страница 20: ...FI 11 WIRING DIAGRAM PZ50VTA FUEL INJECTION SYSTEM ...
Страница 41: ......
Страница 42: ...SPEC 32 CABLE ROUTING CABLE ROUTING ...
Страница 44: ...SPEC 34 CABLE ROUTING ...
Страница 46: ...SPEC 36 CABLE ROUTING ...
Страница 48: ...SPEC 38 CABLE ROUTING ...
Страница 50: ...SPEC 40 CABLE ROUTING ...
Страница 52: ...SPEC 42 CABLE ROUTING ...
Страница 54: ...SPEC 44 CABLE ROUTING ...
Страница 56: ...SPEC 46 CABLE ROUTING ...
Страница 58: ...SPEC 48 CABLE ROUTING ...
Страница 60: ...SPEC 50 CABLE ROUTING ...
Страница 62: ...SPEC 52 CABLE ROUTING ...
Страница 64: ...SPEC 54 CABLE ROUTING ...
Страница 66: ...SPEC 56 ENGINE OIL LUBRICATION CHART ENGINE OIL LUBRICATION CHART ...
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ...WIRING DIAGRAM 2011 PZ50GTA PZ50RTA PZ50MTA ...
Страница 76: ...WIRING DIAGRAM 2011 PZ50GTA PZ50RTA PZ50MTA ...
Страница 77: ...WIRING DIAGRAM 2011 PZ50VTA ...
Страница 78: ...WIRING DIAGRAM 2011 PZ50VTA ...