2-15
CHK
ADJ
1
ENGINE SPEED
1. Warm up the engine for a few minutes.
2. Attach:
9
Digital tachometer
1
Digital tachometer:
YU-39951-B, 90890-06760
3. Measure:
9
Engine speed (with no load)
Out of specification
→
Adjust
Engine speed:
Refer to “SPECIFICATIONS” in
the Supplementary service
manual.
ADJUSTING THE ENGINE SPEED (WITH
THROTTLE LEVER MODEL)
1. Warm up the engine for a few minutes.
2. Attach:
9
Digital tachometer
1
Digital tachometer:
YU-39951-B, 90890-06760
1
PERIODIC MAINTENANCE
a
1
4. Measure:
9
Low engine speed (with no load).
Out of specification
→
Adjust
Low engine speed:
Refer to “SPECIFICATIONS” in
the Supplementary service
manual.
Measurement steps:
a. Move the throttle lever
1
to the low
engine speed position
a
.
b. Check the low engine speed.
Содержание MZ250
Страница 1: ...MZ250 MZ300 SERVICE MANUAL 7VB F8197 10 LIT 19616 01 80 cover indd 1 2012 10 30 12 01 25 ...
Страница 2: ...cover indd 2 2012 10 30 12 01 25 ...
Страница 6: ......
Страница 10: ...CHAPTER 6 TROUBLESHOOTING ENGINE 6 1 ...
Страница 40: ...3 6 ENG FUEL TANK CANISTER CHECKING THE CANISTER 1 Check 9 Canister 1 Cracks damage Replace 1 ...
Страница 116: ...6 9 TRBL ...
Страница 117: ...cover indd 3 2012 10 30 12 01 25 ...
Страница 118: ...2012_09 1 cover indd 4 2012 10 30 12 01 25 ...