8-56
8
5. Install the panel.
TIP
Make sure the positive and negative battery
leads are installed as shown.
Fully charge the battery before installing it.
EBU30524
Replacing a fuse
Tightening torques:
Carrier bolt (upper):
34 N·m (3.4 kgf·m, 25 lb·ft)
Carrier bolt (lower):
34 N·m (3.4 kgf·m, 25 lb·ft)
Carrier bolt (under the fenders):
7 N·m (0.7 kgf·m, 5.2 lb·ft)
1. Fuse box
2. Main fuse
3. EPS fuse
4. Fuel injection system spare fuse
5. Fuel injection system fuse
2
3
4
5
1
UB4F60E0.book Page 56 Wednesday, April 25, 2018 11:52 AM
Содержание GRIZZLY YFM70GPXK 2017
Страница 2: ...DIC183 Original instructions Notice originale Manual original PRINTED IN USA 2018 05 1 1 1 CR E F S...
Страница 12: ...1 2 1 For Europe 2 1 3 4 5 7 6 6 8 9 6 6 13 12 10 11 UB4F60E0 book Page 2 Wednesday April 25 2018 11 52 AM...
Страница 20: ...1 10 1 For Oceania 1 2 3 4 6 11 10 7 8 9 5 5 UB4F60E0 book Page 10 Wednesday April 25 2018 11 52 AM...
Страница 77: ...7 1 7 EBU21142 RIDING YOUR ATV UB4F60E0 book Page 1 Wednesday April 25 2018 11 52 AM...
Страница 168: ...9 3 9 8 Remove the battery and fully charge it See page 8 52 UB4F60E0 book Page 3 Wednesday April 25 2018 11 52 AM...
Страница 176: ...11 2 11 1 Model label 1 UB4F60E0 book Page 2 Wednesday April 25 2018 11 52 AM...
Страница 179: ...UB4F60E0 book Page 3 Wednesday April 25 2018 11 52 AM...