9-56
9
5. Install the panel.
TIP
Make sure the positive and negative battery
leads are installed as shown.
Fully charge the battery before installing it.
EBU30525
Replacing a fuse
Tightening torques:
Carrier bolt (upper):
34 N·m (3.4 kgf·m, 25 lb·ft)
Carrier bolt (lower):
34 N·m (3.4 kgf·m, 25 lb·ft)
Carrier bolt (under the fenders):
7 N·m (0.7 kgf·m, 5.2 lb·ft)
1. Fuse box
2. Main fuse
3. EPS fuse
4. Fuel injection system spare fuse
5. Fuel injection system fuse
2
3
4
5
1
UBDE60E0.book Page 56 Monday, April 22, 2019 4:12 PM
Содержание GRIZZLY YFM700FWAD
Страница 2: ...DIC183 Original instructions Notice originale Manual original PRINTED IN USA 2019 05 0 5 1 CR E F S ...
Страница 14: ...2 2 2 For Europe 2 1 3 4 5 7 6 6 8 9 6 6 13 12 10 11 UBDE60E0 book Page 2 Monday April 22 2019 4 12 PM ...
Страница 17: ...2 5 2 YAMAHA 1HP F811R 00 E10 E5 B4F F817K 00 10 8 9 UBDE60E0 book Page 5 Monday April 22 2019 4 12 PM ...
Страница 21: ...2 9 2 For Oceania 1 2 3 4 6 11 10 7 8 9 5 5 UBDE60E0 book Page 9 Monday April 22 2019 4 12 PM ...
Страница 80: ...8 1 8 EBU21142 RIDING YOUR ATV UBDE60E0 book Page 1 Monday April 22 2019 4 12 PM ...
Страница 171: ...10 3 10 8 Remove the battery and fully charge it See page 9 52 UBDE60E0 book Page 3 Monday April 22 2019 4 12 PM ...
Страница 181: ...UBDE60E0 book Page 3 Monday April 22 2019 4 12 PM ...