8-59
8
2. Connect the positive battery lead first, then
connect the negative battery lead by installing
their bolt.
NOTICE:
When installing the bat-
tery, the main switch must be off, and the
positive lead must be connected before
the negative lead.
[ECB01110]
3. Install the battery holding plate by installing
the nuts.
4. Install the front carrier by installing the bolts
and tightening them to the specified torques.
5. Install the panel.
EBU30520
Replacing a fuse
1. Positive battery lead (red)
2. Negative battery lead (black)
1
2
Tightening torques:
Carrier bolt (top):
34 Nm (3.4 m·kgf, 25 ft·lbf)
Carrier bolt (under the fenders):
7 Nm (0.7 m·kgf, 5.1 ft·lbf)
1. Fuse box
2. Main fuse
3. EPS fuse
4. Fuel injection system spare fuse
5. Fuel injection system fuse
U1HP60E0.book Page 59 Monday, April 11, 2011 7:56 PM
Содержание Grizzly 700 2011
Страница 2: ...PRINTED IN USA 2011 05 0 8 1 CR E F S DIC183 ...
Страница 14: ...1 4 1 37S F816S 00 1P0 F816R 00 YAMAHA 10 11 12 U1HP60E0 book Page 4 Monday April 11 2011 7 56 PM ...
Страница 18: ...1 8 1 For Oceania 1 2 3 4 6 7 9 8 10 5 5 U1HP60E0 book Page 8 Monday April 11 2011 7 56 PM ...
Страница 67: ...7 1 7 EBU21141 RIDING YOUR ATV U1HP60E0 book Page 1 Monday April 11 2011 7 56 PM ...
Страница 171: ...U1HP60E0 book Page 3 Monday April 11 2011 7 56 PM ...
Страница 172: ...PRINTED IN USA 2011 05 0 8 1 CR E U1HP60E0 book Page 1 Monday April 11 2011 7 56 PM ...