Operation
43
garden hose connector is not properly
connected, cooling water can leak out and
the engine can overheat during operation.
[ECM01802]
EMU36942
Install cowling
1.
Be sure that all cowling lock levers are
released.
2.
Be sure that the rubber seal is seated all
the way around the engine.
3.
Place the cowling on top of the seal.
4.
Check to be sure it fits properly in the
rubber seal.
5.
Move the levers to lock the cowling as
shown.
NOTICE:
If the top cowling is
not installed correctly, water spray
under the top cowling can damage the
engine, or the top cowling can blow
off at high speeds.
[ECM01992]
After installing, check the fitting of the top
cowling by pushing it with both hands. If the
top cowling is loose, have it repaired by your
Yamaha dealer.
1. Fitting
2. Flushing device
ZMU06164
1
2
ZMU06131
ZMU06133
U6P27AE0.book Page 43 Friday, December 6, 2013 6:17 PM
Содержание FL200C
Страница 11: ...General information 5 1 CE marking location ZMU06040 U6P27AE0 book Page 5 Friday December 6 2013 6 17 PM ...
Страница 72: ...Maintenance 66 F225CET U6P27AE0 book Page 66 Friday December 6 2013 6 17 PM ...
Страница 99: ...U6P27AE0 book Page 93 Friday December 6 2013 6 17 PM ...
Страница 100: ...Printed on recycled paper Printed in Japan January 2014 0 2 1 CR U6P27AE0 book Page 1 Friday December 6 2013 6 17 PM ...