CAMSHAFTS
5-18
d. Remove the screwdriver, make sure the tim-
ing chain tensioner rod releases, and then
tighten the cap bolt to the specified torque.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
7. Turn:
• Crankshaft
(several turns clockwise)
8. Check:
• “T” mark
Make sure the “T” mark “a” on the pickup ro-
tor is aligned with the crankcase mating sur-
face “b”.
• Camshaft holes
Make sure the holes “c” in the camshafts are
aligned with the arrow marks “d” on the cam-
shaft caps.
Out of alignment
→
Adjust.
Refer to the installation steps above.
9. Measure:
• Valve clearance
Out of specification
→
Adjust.
Refer to “ADJUSTING THE VALVE CLEAR-
ANCE” on page 3-5.
10.Install:
• Cylinder head cover gasket
• Cylinder head cover
TIP
• Apply Three Bond 1514C® “1” onto the mating
surfaces of the cylinder head cover and cylin-
der head cover gasket.
• Apply Yamaha bond No.1215® “2” onto the
mating surfaces of the cylinder head cover
gasket and cylinder head.
• Install a new cylinder head cover gasket “3”,
and then cut the portions “a”.
• Tighten the cylinder head cover bolts in stages
and in a crisscross pattern.
T
R
.
.
Timing chain tensioner cap bolt
6 Nm (0.6 m·kg, 4.3 ft·lb)
1
b
a
T
R
.
.
Cylinder head cover bolt
10 Nm (1.0 m·kg, 7.2 ft·lb)
Yamaha bond No. 1215
90890-85505
(Three Bond No.1215®)
New
Содержание FJR1300A(D)
Страница 1: ...2013 SERVICE MANUAL FJR1300A D 1MC 28197 E0 ...
Страница 6: ......
Страница 8: ......
Страница 70: ...SPECIAL TOOLS 1 61 ...
Страница 101: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 30 ...
Страница 104: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 EAS20410 LUBRICATION DIAGRAMS 5 6 7 1 2 3 4 ...
Страница 106: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 1 3 2 ...
Страница 107: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 36 1 Main axle 2 Drive axle 3 Oil delivery pipe 1 ...
Страница 108: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 6 5 4 3 2 1 ...
Страница 110: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 1 2 3 4 5 6 7 8 9 ...
Страница 112: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 41 4 5 3 2 1 9 8 6 7 ...
Страница 114: ...COOLING SYSTEM DIAGRAMS 2 43 EAS20420 COOLING SYSTEM DIAGRAMS 3 13 4 5 6 7 7 7 8 1 2 10 9 14 15 16 17 11 12 3 ...
Страница 116: ...COOLING SYSTEM DIAGRAMS 2 45 7 1 2 3 4 5 5 8 9 6 8 9 10 11 12 ...
Страница 122: ...CABLE ROUTING 2 51 Rear brake hose right side view 4 5 6 7 8 9 10 11 1 12 13 14 15 2 3 16 1 A B C F E D ...
Страница 124: ...CABLE ROUTING 2 53 Horn and radiator left side view A B 1 1 2 3 4 5 5 6 C 7 7 8 ...
Страница 128: ...CABLE ROUTING 2 57 Rear fender left side view 2 1 3 4 6 5 7 A C B 8 4 5 4 5 J I K 9 10 1 11 12 13 14 15 D F G H E 16 ...
Страница 132: ...CABLE ROUTING 2 61 Rear fender top view 1 2 3 B C A B ...
Страница 138: ...CABLE ROUTING 2 67 ...
Страница 141: ......
Страница 320: ...CAMSHAFTS 5 19 11 Install Cylinder head cover plate 1 TIP Be sure the UP mark a is facing up New 2 2 a 1 3 a a 1 ...
Страница 360: ...SHIFT SHAFT 5 59 c Tighten both locknuts to specification T R Shift rod locknut 7 Nm 0 7 m kg 5 1 ft lb 1 2 c d a b ...
Страница 377: ...MIDDLE GEAR 5 76 Middle driven pinion gear shim Thickness mm 0 10 0 15 0 20 0 30 0 40 0 50 ...
Страница 428: ...WATER PUMP 6 15 ...
Страница 442: ...AIR INDUCTION SYSTEM 7 13 EAS27040 AIR INDUCTION SYSTEM 1 2 3 5 6 7 8 1 1 2 1 1 3 6 7 8 2 2 3 5 4 ...
Страница 455: ...IGNITION SYSTEM 8 6 ...
Страница 461: ...ELECTRIC STARTING SYSTEM 8 12 ...
Страница 465: ...CHARGING SYSTEM 8 16 ...
Страница 477: ...SIGNALING SYSTEM 8 28 ...
Страница 533: ...FUEL INJECTION SYSTEM 8 84 ...
Страница 551: ...CRUISE CONTROL SYSTEM 8 102 ...
Страница 555: ...FUEL PUMP SYSTEM 8 106 ...
Страница 563: ...ACCESSORY BOX SYSTEM 8 114 ...
Страница 573: ...IMMOBILIZER SYSTEM 8 124 ...
Страница 577: ...ABS ANTI LOCK BRAKE SYSTEM 8 128 ...
Страница 616: ...ELECTRICAL COMPONENTS 8 167 7 1 3 2 18 21 20 19 9 11 12 13 14 15 16 17 6 8 4 5 10 ...
Страница 658: ......
Страница 659: ......
Страница 660: ......