BRKT
Bracket unit
7-33
6D93G11
Disassembling the gear pump
1.
Remove the manual valve, then the gear
pump and filters.
2.
Remove the relief valve seat caps, then
the up-relief valve seat
1
and down-
relief valve seat
2
.
3.
Remove the lever
3
, then the shuttle
pistons
4
.
4.
Remove the gear pump bracket
5
, then
the adapters
6
.
5.
Remove the pins
7
, then the drive gear
8
and driven gear
9
.
Checking the gear pump
1.
Clean all the pistons and balls, and then
check them for damage or wear. Replace
if necessary.
2.
Check the filters for damage or clogs.
Replace if necessary.
3.
Check the drive gear and driven gear for
damage or wear. Replace the gear pump
assembly if necessary.
Assembling the gear pump
1.
Install the drive gear
1
and driven gear
2
into the gear pump housing.
2.
Install the balls
3
into the gear pump
housing.
3.
Install the gear pump cover
4
, then the
pins
5
.
S6D87370
4
3
2
1
4
S6D87560
S6C17600
6
6
5
7
7
8
9
S6C17610
1
2
3
3
1
2
3
3
Содержание F80B
Страница 1: ...F80B F100D SERVICE MANUAL 6D9 28197 3G 11 ...
Страница 4: ......
Страница 46: ...CHK ADJ Periodic checks and adjustments 3 17 6D93G11 MEMO ...
Страница 137: ...6D93G11 6 14 1 2 3 4 5 6 7 8 9 Bearing inner race attachment 0 90890 06661 Propeller shaft housing ...
Страница 148: ...LOWR Lower unit 6 25 6D93G11 Shimming 6 ...
Страница 153: ...6D93G11 6 30 1 2 3 4 5 6 7 8 9 MEMO Backlash ...
Страница 215: ...6D93G11 8 12 1 2 3 4 5 6 7 8 9 S60V8265 Br B Fuel control system Starting system ...
Страница 244: ...Index i 4 6D93G11 U Upper case 7 6 V Vapor separator 4 10 Ventilation 1 3 Y Yamaha Diagnostic System 9 2 ...
Страница 245: ...6D93G11 i 5 1 2 3 4 5 6 7 8 9 Index MEMO ...
Страница 247: ......
Страница 248: ...YAMAHA MOTOR CO LTD Printed in the Netherlands Nov 2004 1 2 1 CR E ...