E
ROCKER ARM AND VALVES
POWR
ROCKER ARM AND VALVES
EXPLODED DIAGRAM
1
2
3
6
7
8
9
10
6
7
8
4
3
2
1
4
5
11
10 Nm (1.0 m•kg, 7.2 ft•lb)
271
271
5-15
REMOVAL AND INSTALLATION CHART
Step
1
2
3
4
5
6
7
8
9
10
11
Q’ty
2
2
2
2
1
2
2
2
1
1
1
Service points
Follow the left “Step” for removal.
Apply LOCTITE
®
No.271
Reverse the removal steps for installation.
Not reusable
Procedure/Part name
ROCKER ARM AND
VALVE REMOVAL
Locknuts
Valve adjuster
Rocker arms
Rocker arm pivot
Push rod guide
Valve cotters
Valve spring seats
Valve springs
Intake valve
Exhaust valve
Valve seals
Содержание F4
Страница 106: ...E FUEL PUMP FUEL 4 7 SERVICE POINTS Fuel pump inspection 1 Inspect 9Diaphragm Damage Replace ...
Страница 296: ...E TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 306: ......
Страница 307: ...Printed in JAPAN February 1998 2 09 1 n 67D 28197 Z8 C1 F4AMH Printed on recycled paper YAMAHA MOTOR CO LTD ...