5-19
Engine control unit and component
2.
Check:
• Engine ECM ground circuit continuity
Out of specification
Replace the wire
harness.
3.
Measure:
• Engine ECM input voltage
Out of specification
Check the wire har-
ness for continuity.
4.
Measure:
• Engine ECM input voltage
Out of specification
Check the wire har-
ness for continuity.
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a.
Turn the engine start switch to ON, and
then measure the input voltage at the en-
gine ECM coupler terminal and ground.
b.
Turn the engine start switch to OFF.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
5.
Connect:
• Engine ECM couplers
Checking the TP
S
1.
Measure:
• TPS output voltage
Out of specification
Check the TPS in-
put voltage.
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a.
Connect the YDIS to display “TPS volt-
age”.
b.
Start the engine and warm it up for 5–10
minutes, and then stop it.
Engine ECM ground circuit continu-
ity
Terminal 39–Ground
Terminal 48–Ground
Terminal 17–Ground
Engine ECM input voltage
12 V
Terminal 45–Ground
39
4
8
17
b
a
45
a
Engine ECM input voltage
12 V
Terminal 36–Ground
Output voltage at throttle valve ful-
ly closed
0.67 V
Throttle valve opening angle at
throttle valve fully closed (refer-
ence data)
0.1
36
a
Содержание F30B 2018
Страница 1: ...6BG 28197 ZX 11 LIT 18616 03 84 USA CAN AUS and NZL Worldwide 6BG 6BT 6BG 6BT ...
Страница 22: ...1 Specification Specification data 1 1 External dimensions 1 1 Clamp bracket dimensions 1 9 ...
Страница 35: ...2 3 Electronic control system Electrical components 3 4 5 6 7 8 9 10 11 1 2 ...
Страница 178: ...7 23 Wire harness 2 3 1 a c b 3 4 5 ...
Страница 342: ...Jul 2018 ABE E ...