5-12
Electrical component and wire harness routing
1. Engine start switch coupler
2. Extension wire harness
3. Alert indicator harness
4. Grommet
5. Engine start switch
6. Engine shut-off switch
7. Alert buzzer
8. Neutral switch
9. PTT switch (F30HA, F40HA)
10. Trolling switch
11. Alert indicator
A. Run the leads (blue and black) under
the control link assembly.
B. Run the neutral switch leads (brown)
under the buzzer.
C. Bend the extension wire harness “2”,
and then connect the harness coupler.
This harness bending position must be
10.0 mm (0.39 in) or more away from
the engine start switch coupler “1”. The
bend radius should be 10.0 mm (0.39 in)
or more.
D. Align the tape ends of the extension
wire harness “2” and the alert indicator
harness “10” with the end of the grom-
met “9”.
E. Install the engine start switch “8” with
the hole of the switch facing upward.
Содержание F30B 2018
Страница 1: ...6BG 28197 ZX 11 LIT 18616 03 84 USA CAN AUS and NZL Worldwide 6BG 6BT 6BG 6BT ...
Страница 22: ...1 Specification Specification data 1 1 External dimensions 1 1 Clamp bracket dimensions 1 9 ...
Страница 35: ...2 3 Electronic control system Electrical components 3 4 5 6 7 8 9 10 11 1 2 ...
Страница 178: ...7 23 Wire harness 2 3 1 a c b 3 4 5 ...
Страница 342: ...Jul 2018 ABE E ...