10-4
Predelivery check
0
1
2
3
4
5
6
7
8
9
10
A
Checking the engine oil level
1.
Place the outboard motor in an upright
position.
NOTICE:
If the outboard
motor is not level, the oil level indi-
cated on the dipstick may not be cor-
rect.
2.
Start the engine and warm it up for 5–10
minutes.
3.
Stop the engine and leave it off for 5–10
minutes.
4.
Remove the top cowling.
5.
Remove the dipstick
a
and wipe it clean.
6.
Insert the dipstick
a
completely for a
correct measurement and remove it
again.
7.
Check that the oil level indicated on the
dipstick
a
is between the upper mark
a
and the lower mark
b
. If the engine oil is
not at the proper level, add or extract
engine oil.
Checking the communication
between the engine and the Digital
Electronic Control
Check the SPS output voltage, shift request,
LPS output voltage, and throttle request that
are displayed on the YDIS engine monitor.
1.
Move the control lever to the F, N, and R
positions to check the SPS output volt-
age and shift request in each position.
2.
Move the control lever to the F fully open
position, F position, N position, R posi-
tion, and R fully open position, and then
check the LPS output voltage and throttle
request in each position.
a
b
a
SPS output voltage:
F position: 0.20–0.79 V
N position: 2.24–2.77 V
R position: 4.21–4.80 V
Shift request:
F position: 100%
N position: 0%
R position: –100%
LPS output voltage:
F fully open position: 4.41–4.71 V
F position: 2.66–2.92 V
N position: 2.07–2.33 V
R position: 1.47–1.74 V
R fully open position: 0.29–0.59 V
Throttle request:
Fully open F position: 100%
F position, N position, R position: 0%
R Fully open position: 100%
Fail: Over 4.8 V and less than 0.2 V
Содержание F225F
Страница 1: ...SERVICE MANUAL 6CE 28197 3N 11 F L 225F F L 250D F L 300B ...
Страница 4: ......
Страница 54: ...1 31 SPEC Specification MEMO ...
Страница 89: ...2 34 Lower unit 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 116: ...3 25 RIG GING Rigging information SET MENU CANCEL a b b c c c D q e E p v w o v C m h A B D D A B D D D F B ...
Страница 218: ...5 55 ELEC Electrical system 2 Connect the Y COP coupler a Y COP input voltage Red R Ground 12 0 V battery voltage R B a ...
Страница 254: ...6 19 FUEL Fuel system 3 Install the blowby hose f 4 Connect the air temperature sensor coupler a f a ...
Страница 263: ...6 28 Canister 0 1 2 3 4 5 6 7 8 9 10 A j k f b ...
Страница 267: ...6 32 Low pressure fuel pump 0 1 2 3 4 5 6 7 8 9 10 A 11 Fasten the vapor gas hoses p and q using the holder r q r p ...
Страница 296: ...7 13 Power unit POWR 21 Install the tube retainer H and then fasten it using the plastic tie I I H H ...
Страница 319: ...7 36 Shift actuator 0 1 2 3 4 5 6 7 8 9 10 A Shift actuator bolts d 19 N m 1 9 kgf m 14 0 ft lb c b d d a ...
Страница 477: ...8 98 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 493: ...9 14 Upper case and mount 0 1 2 3 4 5 6 7 8 9 10 A Lower mount bracket bolt o 55 N m 5 5 kgf m 40 6 ft lb t u v t v u o ...
Страница 537: ...9 58 PTT cylinder 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 562: ...A 1 MEMO ...
Страница 565: ......
Страница 566: ...May 2010 1 ABE E_1 YAMAHA MOTOR CO LTD ...
Страница 576: ...A 13 ...