4-8
Troubleshooting the power unit
0
1
2
3
4
5
6
7
8
9
10
A
T
roub
le code and c
h
ec
king step
The de
scr
iptions enclosed b
y
<
>
are ap
plicab
le
to the
twin and
tr
ip
le en
gine
installation
s
.
—: Not app
licab
le
Tr
o
u
b
le
code
It
em
C
o
n
d
it
ion
L
A
N ga
uge
dis
p
la
y
Sym
p
to
m
R
ema
rks
Chec
king
st
ep
s
S
ee
p
age
13
Pulser coil
mal-
fu
nct
ion
Ir
re
gula
r sign
al
C/
E
E
ng
ine do
es not
re
st
ar
t
E
n
g
in
e st
op
s
su
dde
nly
.
Me
asur
e t
he pu
lser coil air
gap
.
Me
asur
e t
he pu
lser coil ou
tp
ut
p
eak v
o
lt
age
.
Me
asur
e t
he pu
lser coil re
sis-
ta
nc
e
.
Chec
k
f
o
r
wir
ing c
o
ntin
uity
b
e
tw
ee
n t
he pu
lser coil an
d th
e
e
ngin
e
ECM
.
Che
c
k
th
e pr
ot
ru
sio
n
s on
th
e f
ly-
wh
ee
l m
a
gn
et
f
o
r
da
m
a
g
e
.
15
Engin
e
te
mp sen
-
so
r ma
lfu
n
ctio
n
Out
of
sp
ecifica-
tio
n
C/E
High engine idle speed
Deg
ra
ded
a
c
ce
ler
a
tio
n
per
fo
rm
ance
Declining maxim
u
m engine s
p
eed
<Dif
fe
rence in
e
ngin
e
idle speeds
>
<E
ng
ine
s
p
e
e
d
s
do
n
o
t sy
nc
hr
o-
niz
e
>
—
Me
asur
e t
he en
gin
e
te
mpe
ra-
tu
re
sensor
inpu
t v
o
lt
a
g
e
.
Me
asur
e t
he en
gin
e
te
mpe
ra-
tu
re
sensor
re
sist
ance
.
Chec
k
f
o
r
wir
ing c
o
ntin
uity
b
e
tw
ee
n th
e eng
ine
t
e
mp
er
a
tu
re
sen
s
o
r an
d th
e en
gine
ECM.
17
Knoc
k se
nsor
malfunc
tion
Ir
re
gula
r sign
al
C/
E
High en
gin
e
idle spe
e
d
<Dif
fe
rence in
e
ngin
e
idle
spe
e
d
s
>
<E
ng
ine
s
p
e
e
d
s
do
n
o
t sy
nc
hr
o-
niz
e
>
—
Me
asur
e t
h
e
kn
oc
k sen
s
o
r r
e
sis-
ta
nc
e
.
Chec
k
f
o
r
wir
ing c
o
ntin
uity
b
e
tw
ee
n t
he knoc
k sensor
and
th
e en
g
ine
ECM
.
Содержание F225F
Страница 1: ...SERVICE MANUAL 6CE 28197 3N 11 F L 225F F L 250D F L 300B ...
Страница 4: ......
Страница 54: ...1 31 SPEC Specification MEMO ...
Страница 89: ...2 34 Lower unit 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 116: ...3 25 RIG GING Rigging information SET MENU CANCEL a b b c c c D q e E p v w o v C m h A B D D A B D D D F B ...
Страница 218: ...5 55 ELEC Electrical system 2 Connect the Y COP coupler a Y COP input voltage Red R Ground 12 0 V battery voltage R B a ...
Страница 254: ...6 19 FUEL Fuel system 3 Install the blowby hose f 4 Connect the air temperature sensor coupler a f a ...
Страница 263: ...6 28 Canister 0 1 2 3 4 5 6 7 8 9 10 A j k f b ...
Страница 267: ...6 32 Low pressure fuel pump 0 1 2 3 4 5 6 7 8 9 10 A 11 Fasten the vapor gas hoses p and q using the holder r q r p ...
Страница 296: ...7 13 Power unit POWR 21 Install the tube retainer H and then fasten it using the plastic tie I I H H ...
Страница 319: ...7 36 Shift actuator 0 1 2 3 4 5 6 7 8 9 10 A Shift actuator bolts d 19 N m 1 9 kgf m 14 0 ft lb c b d d a ...
Страница 477: ...8 98 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 493: ...9 14 Upper case and mount 0 1 2 3 4 5 6 7 8 9 10 A Lower mount bracket bolt o 55 N m 5 5 kgf m 40 6 ft lb t u v t v u o ...
Страница 537: ...9 58 PTT cylinder 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 562: ...A 1 MEMO ...
Страница 565: ......
Страница 566: ...May 2010 1 ABE E_1 YAMAHA MOTOR CO LTD ...
Страница 576: ...A 13 ...