BRKT
Bracket unit
9-11
0
Installing the cowling lock lever
1.
Install the cowling lock lever
1
and lever
2
.
2.
Install the spring
3
.
3.
Inject grease into the housing
4
until
grease comes out from the housing.
Installing the PTT switch
Do not reuse a gasket, always replace it
with a new one.
1.
Install a new gasket
1
, the PTT switch
2
, and the holder
3
.
2.
Fasten the PTT switch lead
a
using the
holder
4
(regular rotation model) or
holder
5
(counter rotation model).
È
Regular rotation model
É
Counter rotation model
TIP:
To fasten the PTT switch lead, see “Wiring
harness routing” (5-6).
Flushing hose adapter screw
C
:
5 N·m (0.5 kgf·m, 3.7 ft·lb)
B
1
D
E
G
F
C
2
1
3
4
3
4
1
2
STBD
a
È
3
2
5
a
1
PORT
É
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...