7-86
7
Checking the piston diameter
1.
Measure the piston diameter
a
at the
specified measuring point
b
.
Checking the cylinder bore
1.
Measure the cylinder bore (D
1
–D
6
) at
measuring points
a
,
b
, and
c
, and in
direction
d
(D
1
, D
3
, D
5
), which is parallel
to the crankshaft, and direction
e
(D
2
,
D
4
, D
6
), which is at a right angle to the
crankshaft.
a
20 mm (0.8 in)
b
50 mm (2.0 in)
c
80 mm (3.1 in)
Checking the piston ring
1.
Check the piston ring dimensions B and
T.
Checking the piston ring end gap
(reference)
1.
Level the piston ring
1
in the cylinder
using a piston crown at the specified
measuring point
a
.
2.
Measure the piston ring end gap
b
.
Water
temperature
Valve opening
a
58–62 °C
(136–144 °F)
Starts opening
above 70 °C
(158 °F)
4.3 mm (0.17 in) or above
Piston diameter
a
:
93.921–93.941 mm (3.6977–3.6985
in)
Measuring point
b
:
13.500 mm (0.5315 in) up from the
bottom of the piston skirt
b
a
D
1
D
2
D
3
D
4
D
5
D
6
a
b
c
d
e
Cylinder bore (D
1
–D
6
):
94.000–94.017 mm (3.7008–3.7014
in)
Piston ring dimensions:
Top ring
a
:
B: 1.200 mm (0.0472 in)
T: 2.800–3.000 mm (0.1102–0.1181 in)
Second ring
b
:
B: 1.170–1.190 mm (0.0461–0.0469 in)
T: 3.700–3.900 mm (0.1457–0.1535 in)
Oil ring
c
:
B: 2.400–2.470 mm (0.0945–0.0972 in)
T: 2.300–2.700 mm (0.0906–0.1063 in)
T
B
T
T
B
B
a
b
c
b
a
1
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...