![Yamaha F200B Скачать руководство пользователя страница 250](http://html.mh-extra.com/html/yamaha/f200b/f200b_service-manual_901675250.webp)
6-41
FUEL
Fuel system
Assembling the vapor separator
Do not reuse a gasket, always replace it
with a new one.
1.
Install the needle valve assembly
1
, and
then tighten the needle valve assembly
screw
2
to the specified torque.
2.
Install the float
3
and pin
4
, and then
tighten the float pin screw
5
to the spec-
ified torque.
3.
Install the damper
6
, joint
7
, filter
8
, fil-
ter holder
9
, and lead
0
.
4.
Connect the high-pressure fuel pump
coupler
a
, and then install the grommet
A
and high-pressure fuel pump
B
.
5.
Install a new gasket
C
and the float
chamber cover
D
, and then tighten the
float chamber cover screws
E
to the
specified torque.
6.
Install the check valve
F
, the filter
G
, a
new gasket
H
, and the vapor separator
cover
I
, and then tighten the vapor sep-
arator cover bolts
J
to the specified
torque.
Needle valve assembly screw
2
:
2 N·m (0.2 kgf·m, 1.5 ft·lb)
Float pin screw
5
:
2 N·m (0.2 kgf·m, 1.5 ft·lb)
5
3
4
1
2
8
6
7
9
0
Float chamber cover screw
E
:
2 N·m (0.2 kgf·m, 1.5 ft·lb)
a
B
A
C
E
D
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...