5-56
5
10. Connect the engine ECM coupler.
NOTICE:
Make sure that the rubber
seal is installed properly in the engine
ECM coupler.
11. Install the engine ECM, and then tighten
the engine ECM bolts to the specified
torque.
12. Install the engine ECM cover.
13. Connect the pulser coil coupler.
14. Install the flywheel magnet cover.
Checking the air temperature sensor
1.
Measure the ambient temperature.
2.
Connect the YDIS to display “Intake tem-
perature” (air temperature).
3.
Check that the difference between the
ambient temperature and the displayed
intake temperature is within
±
5 °C (
±
41
°F).
TIP:
• Check the air temperature sensor when the
engine is cold.
• When checking the air temperature sensor,
remove the top cowling and do not start the
engine.
4.
Remove the flywheel magnet cover.
5.
Disconnect the air temperature sensor
coupler
a
.
6.
Turn the engine start switch to ON, and
then measure the input voltage at the air
temperature sensor coupler.
7.
Turn the engine start switch to OFF.
8.
Remove the air temperature sensor.
9.
Place the air temperature sensor in a
container of water and heat the water
slowly.
10. Measure the air temperature sensor
resistance at the specified temperatures.
11. Install the air temperature sensor.
12. Remove the engine ECM cover.
13. Remove the engine ECM, and then dis-
connect the engine ECM coupler
b
.
Wiring harness continuity:
a
Terminal 1–
b
Terminal 15
a
Terminal 2–
b
Terminal 16
Engine ECM bolt:
7 N·m (0.7 kgf·m, 5.2 ft·lb)
Air temperature sensor input voltage:
Black/Yellow (B/Y)–Black (B)
4.75–5.25 V
Air temperature sensor resistance
(reference data):
2.21–2.69 k
Ω
at 20 °C (68 °F)
0.32 k
Ω
at 80 °C (176 °F)
B
B/Y
a
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...