5-55
ELEC
Electrical system
12. Install the engine ECM, and then tighten
the engine ECM bolts to the specified
torque.
13. Connect the ignition coil couplers.
14. Install the engine ECM cover.
Checking the pulser coil
1.
Remove the flywheel magnet cover.
2.
Disconnect the pulser coil coupler
a
.
3.
Connect the special service tool
1
.
4.
Measure the pulser coil output peak volt-
age.
NOTICE:
Check that the wiring
harness does not interfere with the
flywheel magnet.
TIP:
• When measuring the output peak voltage
under the cranking condition, remove the
clip from the engine shut-off switch to pre-
vent the engine from starting.
• When measuring the output peak voltage
under the unloaded condition, disconnect
the pulser coil coupler
a
.
5.
Disconnect the special service tool.
6.
Measure the pulser coil resistance.
7.
Remove the engine ECM cover.
8.
Remove the engine ECM, and then dis-
connect the engine ECM coupler
b
.
9.
Check the wiring harness for continuity.
Engine ECM bolt:
7 N·m (0.7 kgf·m, 5.2 ft·lb)
Test harness (2 pins)
1
: 90890-06867
a
G/W
G
W/B
B
W/R
B
a
1
W/R B
a
1
Pulser coil output peak voltage:
White/Red (W/R)–Black (B)
r/min
Unloaded
Loaded
Cranking
1500
3500
DC V
3.0
2.7
14.5
17.8
Pulser coil resistance (reference data):
White/Red (W/R)–Black (B)
396.0–594.0
Ω
at 20 °C (68 °F)
b
b
a
2
1
16 15
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...