6D55F11
2-8
1
2
3
4
5
6
7
8
9
Charge coil output peak
voltage
(G/W – W/G)
at cranking (unloaded)
V
170.0
at cranking (loaded)
V
130.0
at 1,500 r/min (loaded)
V
140.0
at 3,500 r/min (loaded)
V
140.0
Charge coil resistance
(*1)
(G/W – W/G)
at 20 °C (68 °F)
Ω
660–710
Power bobbin output peak
voltage
(Y/B – Y/B)
at cranking (unloaded)
V
10.0
at 1,500 r/min (unloaded)
V
38.9
at 3,500 r/min (unloaded)
V
80.0
at cranking (loaded)
V
5.5
at 1,500 r/min (loaded)
V
30.0
at 3,500 r/min (loaded)
V
80.0
Power bobbin resistance
(*1)
(Y/B – Y/B)
at 20 °C (68 °F)
Ω
6.50–7.20
Lighting coil output peak
voltage
(Y – Y)
at cranking (unloaded)
V
9.4
at 1,500 r/min (unloaded)
V
46.0
at 3,500 r/min (unloaded)
V
95.0
Lighting coil resistance
(*1)
(Y – Y)
at 20 °C (68 °F)
Ω
0.90–1.10
Enrichment control system
Prime Start
Plunger extended length
a
(*1)
mm
(in)
10.7–15.4 (0.42–0.61)
Prime Start resistance
(*2)
(Y – Y)
at 20 °C (68 °F)
Ω
17.7–18.7
(*1)
The figures are for reference only.
(*2)
Measuring condition:
Prime Start plunger length is 10.7 mm (0.42 in).
The figures are for reference only.
Item
Unit
Model
F25CMH
F25CM
Maintenance specification
Содержание F2.5C
Страница 1: ...F25C SERVICE MANUAL 6D5 28197 5F 11 290539 ...
Страница 4: ......
Страница 16: ...GEN INFO General information 1 11 6D55F11 MEMO ...
Страница 27: ...6D55F11 2 10 1 2 3 4 5 6 7 8 9 Clamp bracket Maintenance specification ...
Страница 46: ...FUEL Fuel system 4 1 6D55F11 Special service tools 4 Vacuum pressure pump gauge set 90890 06756 ...
Страница 112: ...POWR Power unit 5 51 6D55F11 MEMO ...
Страница 136: ...LOWR Lower unit 6 23 6D55F11 Shimming 6 S6D56370 T3 A3 B3 42 5 T1 T2 24 0 24 0 B2 A1 A2 B1 ...
Страница 173: ...6D55F11 TRBL SHTG 1 2 3 4 5 6 7 8 9 Troubleshooting Power unit 9 1 ...
Страница 183: ......
Страница 184: ...YAMAHA MOTOR CO LTD Printed in Japan Nov 2003 0 4 1 CR E Printed on recycled paper ...