5-15
ELEC
Electrical system
4.
Turn the engine start switch to “ON,” and
then measure the input voltage between
terminals
f
and
g
.
5.
Turn the engine start switch to “OFF,” and
then install the main relay
a
.
Checking the engine ECM circuit
1.
Remove the junction box cover, and then
disconnect the engine ECM coupler
a
.
2.
Check for continuity between the engine
ECM coupler terminals (32 and 42) and
ground.
3.
Measure the input voltage at the engine
ECM coupler terminal 16 and ground.
4.
Turn the engine start switch to “ON,” and
then measure the input voltage at the
engine ECM coupler terminal 13 and
ground.
Main relay input voltage:
Terminal
f
–Terminal
g
12.0 V (battery voltage)
g
f
a
Engine ECM input voltage:
Terminal 16–Ground
12.0 V (battery voltage)
42
32
a
a
16
Содержание F150B
Страница 1: ...SERVICE MANUAL 6BM 28197 5L 11 F150B FL150B ...
Страница 4: ......
Страница 12: ...0 7 GEN INFO General information Symbol Name Application LOCTITE 242 blue Sealant LOCTITE 572 white Sealant ...
Страница 211: ...6 34 Vapor separator 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 311: ...8 32 Shimming regular rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T1 T2 ...
Страница 351: ...8 72 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T2 T4 T1 ...
Страница 448: ...A 1 MEMO ...
Страница 451: ......
Страница 452: ...Printed in China Jul 2008 0 6 1 ABE E_4 YAMAHA MOTOR CO LTD ...
Страница 458: ......