CDC-E500
CDC-E500
8
■
MAIN P.C.B. OPERATION CHECK
1. Remove the CDC Mechanism Unit.
2. Disconnect cable from Connector (CB6) in Fig. 2.
At this time, unwind this cable wound around the ferrite core.
3. Remove 4 screws fixing the MAIN (2) P.C.B. to the chassis.
Remove 4 screws fixing the MAIN (1) P.C.B. to the rear panel.
4. Remove the MAIN (1) P.C.B. and the MAIN (2) P.C.B. together.
5. Place the MAIN (1) P.C.B. and the MAIN (2) P.C.B. on the blocks.
6. Reinstall the CDC Mechanism Unit.
7. Using extension cables, make connections.
1
Bancard
: 16P 420mm (V6565800)
2
C & C assembly set : 4P 450mm and 8P 450mm (AAX28730)
8. Using a lead wire, connect the grounding of the pin jack (PJ1) and the system connector (JK1) to the rear panel.
(If it is left unconnected, the grounding floats and the unit may fail to function properly.)
CB1
MAIN (1) P.C.B.
MAIN (2) P.C.B.
CB6
CB200
CB2
CB4
8P
16P
4P
CB3
1
2
Block
Block
b. Pull out the drawer to open it fully. (Fig. 5)
Fig. 5
(Drawer opened fully)
Содержание CRX-E500
Страница 5: ...CDC E500 CDC E500 5 REAR PANELS U C models A model ...
Страница 23: ...CDC E500 CDC E500 23 TIMING CHART ...