–7–
1
Pick up coil lead
2
Neutral switch lead
3
C.D.I unit
4
Rear flasher lead (right)
5
Rear flasher lead (left)
6
Tail / Brake light lead
7
Clutch switch lead
8
Wireharness
9
Clamp
10
Throttle cable
11
Thermo switch lead
12
Thermo switch
A Fasten the junction to the wire-
harness with a band and cut the
end of band. (except for ignition
coil lead and earth lead.)
B Clamp the sidestand switch
lead, battery negative lead and
cut the end.
C Route the battery positive lead
between air filter case and mud
guard set the battery positive ter-
minal.
CABLE ROUTING
SPEC
13
Battery negative lead
14
Starter motor lead
15
Rectifier / Regulator
16
Starter relay
17
Battery positive lead
18
Side stand switch lead
19
Side stand switch
20
Clutch cable
21
Wire guide
22
Brake hose
23
Brake hose holder
24
Wire holder
25
Speed meter cable
26
Handlebar switch lead
Содержание 1999 SR125
Страница 1: ......
Страница 2: ......
Страница 8: ......
Страница 14: ... 6 CABLE ROUTING SPEC E Clamp the clutch cable to the down tube of the frame F Cover the sack to the couplers ...