5-8
GB
Procedure
1)
Remove the top cowling.
2)
Remove the flywheel cover by remov-
ing the bolts.
3)
Prepare the engine for starting. See
“STARTING ENGINE” for procedures.
Be sure the engine is in Neutral and
that the lanyard is attached to the
engine stop switch. The main switch
must be on.
208022
305034
ON START
OFF
701024
NOTE:
8
In this case, choke switch will not oper-
ate. Pull out the choke knob when
engine is cold.
8
Without setting the main switch to
“ON”, it is impossible to start the
engine.
4)
To start the engine with the emer-
gency starter rope, insert the knotted
end of the rope into the notch in the
flywheel rotor and wind the rope sev-
eral turns clockwise. Then, give a
strong pull straight out to crank the
engine. Repeat if necessary.
w
Do not install the top cowling when
engine is running.
208016
55/75/85
208041
115
697-9-75 (GB,F,ES)5 5/8/01 2:44 PM Page 224
Содержание 115B
Страница 2: ...shiro A5 5 30 00 2 20 PM Page 1 ...
Страница 59: ... MEMO 697 9 75 GB F ES 2B 5 8 01 2 53 PM Page 27 ...
Страница 145: ... MEMO 697 9 75 GB F ES 4A 5 8 01 2 46 PM Page 157 ...
Страница 163: ... MEMO 697 9 75 GB F ES 4B 5 8 01 2 45 PM Page 181 ...
Страница 212: ...EMP00010 Chapter 6 INDEX INDEX 6 1 GB 697 9 75 GB F ES 6 5 8 01 2 43 PM Page 230 ...
Страница 220: ...shiro A5 5 30 00 2 20 PM Page 1 ...
Страница 221: ...shiro A5 5 30 00 2 20 PM Page 1 ...