
VX-8DR/DE O
PERATING
M
ANUAL
174
I
NSTALLATION
OF
THE
BU-2
(
O
PTION
)
Figure 2
Connector Unit
BU-2
Figure 1
1.
Make sure that the transceiver is off. Remove the hard or soft case, if used.
2.
Remove the battery pack.
3.
Locate the connector for the
BU-2
under the Caution Seal in the battery compartment
on the back of the transceiver, just peel off the Caution Seal (
Figure 1
).
Cleanly remove the old Caution Seal and adhesive to preserve the submersible per-
formance.
4.
Gently install the supplied Connector Unit to the transceiver’s connector, then align
the connector on the
BU-2
with the connector of the Connector Unit and gently press
the
BU-2
into place (
Figure 2
).
5.
Affix the new (supplied) Caution Seal, and replace the battery pack.
6.
Installation is now complete.
Содержание VX-8DE
Страница 47: ...VX 8DR DE OPERATING MANUAL 45 NOTE ...
Страница 61: ...VX 8DR DE OPERATING MANUAL 59 NOTE ...
Страница 77: ...VX 8DR DE OPERATING MANUAL 75 NOTE ...
Страница 99: ...VX 8DR DE OPERATING MANUAL 97 NOTE ...
Страница 173: ...VX 8DR DE OPERATING MANUAL 171 APRS GPS SET MODE NOTE ...
Страница 177: ...VX 8DR DE OPERATING MANUAL 175 NOTE ...