VESDA by Xtralis
VESDA Commissioning Guide
www.xtralis.com
19
5
System Integrity Test
VESDA systems can be tested in a number of different ways. Most sites will require different types of testing
for different customer environments. Before conducting smoke tests you must check to see if the local codes
and standards specify which type of smoke test is to be performed. Local codes and standards may also
require changes to the general instructions below, where local codes and standards are different to the
VESDA suggestions, ALWAYS follow the local codes and standards.
Performance testing is done during commissioning and may be required during service, but is not essential.
We highly recommend pipe integrity testing be performed each year.
Note:
Some tests create a large amount of smoke, so you should take the necessary precautions before you
begin testing.
5.1
Performance-based Smoke Testing
A smoke test is necessary to prove the integrity of the pipe network and to measure the response time. The
type of smoke test required will depend upon the site and the application:
l
Warehouses and open areas can use either a smoke pellet test, a polyurethane mat test, or possibly a
wooden block test. Please check with the local codes and standards to find the most appropriate type of
test for the environment.
l
Very sensitive sites can use the electrical overload (PVC coated wire burn test), or the smouldering test
coil test. (UK customers can refer to BS 6266, BFPSA Code of Practice Appendix A for system
performance test methods).
We recommend that at least two tests are conducted. You must allow the environment to return to the normal
conditions before beginning the second test.
Record the date and the type of smoke test used on the commissioning or testing forms. Please re-read the
detector manuals if you are unsure of how to interpret smoke levels, Alert, Alarm or Fire1.
At a minimum, testing requires that you conduct pipe integrity smoke testing.
5.1.1
Testing and Stratification Problems
In areas with a high roof you can expect the air temperature near the roof to be warmer than the air temperature
at ground level. This can cause the stratification of smoke. Stratification occurs when warm smoke rises until
it reaches a layer of air with the same temperature and then stops rising. This may cause problems as the
smoke may not reach sample points which are mounted on the roof.
As the height of the roof increase you will need a larger distance between the roof and the sampling point to
continue correctly sampling the air. Heights up to 3 m (9 ft) can use standard 25 mm (1 in.) standoffs.
Roof Height (M)
1
2
3
4
5
6
7
8
9
Distance from roof (mm)
30
30
30
100
200
300
400
500
600
For testing purposes you can use a 5.8 kW gas burner or electric heater to add heat to the smoke to make sure
it will reach the roof.
Содержание VESDA E-Series
Страница 1: ...VESDA Student Workbook Rev 8a 15SEP21...
Страница 4: ...iv...
Страница 14: ...VESDA Course Overview 1 10 VESDA Student Workbook Create Xtralis Account...
Страница 20: ...VESDA Course Overview 1 16 VESDA Student Workbook...
Страница 23: ...VESDA Products VESDA Student Workbook 2 3 ASD iVESDA ASD...
Страница 24: ...VESDA Products 2 4 VESDA Student Workbook VESDA model comparison chart...
Страница 28: ...VESDA Products 2 8 VESDA Student Workbook Evacuation is a challenge Discreet detection is required...
Страница 29: ...VESDA Products VESDA Student Workbook 2 9 Discreet detection is required Maintenance access is difficult...
Страница 30: ...VESDA Products 2 10 VESDA Student Workbook Maintenance access is difficult Suppression System pairing...
Страница 31: ...VESDA Products VESDA Student Workbook 2 11 Healthcare Data Centers communication infrastructure...
Страница 32: ...VESDA Products 2 12 VESDA Student Workbook Industrial facilities Industrial facilities...
Страница 33: ...VESDA Products VESDA Student Workbook 2 13 Solutions for all environments Detectors...
Страница 56: ...Installation 3 4 VESDA Student Workbook IDP Installation Practices...
Страница 68: ...Installation 3 16 VESDA Student Workbook...
Страница 74: ...VESDAnet Connection 4 6 VESDA Student Workbook...
Страница 138: ...VSC Software Configuration 6 34 VESDA Student Workbook View Event Log View Event Log Click View Select Event Log...
Страница 141: ...VSC Software Configuration VESDA Student Workbook 6 37 Save Data Save Data Click File Select Save...
Страница 151: ...ASPIRE Software VESDA Student Workbook 7 7 Set Preferences Set preferences Double click the ASPIRE icon...
Страница 180: ...ASPIRE Software 7 36 VESDA Student Workbook Isometric Ceiling Pipe Network Original CAD drawing...
Страница 188: ...ASPIRE Software 7 44 VESDA Student Workbook VES Scan vs Non Scan Modes SCAN Pipe 1 Pipe 2 Create a Dry Storage Warehouse...
Страница 192: ...ASPIRE Software 7 48 VESDA Student Workbook Generate IDP The IDP is complete Generate BOM Click File Select Generate BOM...
Страница 193: ...ASPIRE Software VESDA Student Workbook 7 49 Generate BOM Select Yes Click OK Generate BOM The BOM is complete...
Страница 218: ...VSC Software Installation A 4 VESDA Student Workbook...
Страница 219: ...Section B VESDA Student Workbook B 1 ASPIRE Software Installation Software installation Double click the ASPIRE software...
Страница 224: ...ASPIRE Software Installation B 6 VESDA Student Workbook...
Страница 238: ...14...
Страница 239: ...VESDA Pipe Network Design Guide February 2019 Document 10193_09 Part Number 30009...
Страница 240: ......
Страница 244: ...VESDA Pipe Network Design Guide VESDA by Xtralis iv www xtralis com This page is intentionally left blank...
Страница 246: ...VESDA Pipe Network Design Guide VESDA by Xtralis 2 www xtralis com 11 Recording Pipe Network Design Specifications 47...
Страница 248: ...VESDA Pipe Network Design Guide VESDA by Xtralis 4 www xtralis com This page is intentionally left blank...
Страница 250: ...VESDA Pipe Network Design Guide VESDA by Xtralis 6 www xtralis com This page is intentionally left blank...
Страница 272: ...VESDA Pipe Network Design Guide VESDA by Xtralis 28 www xtralis com This page is intentionally left blank...
Страница 278: ...VESDA Pipe Network Design Guide VESDA by Xtralis 34 www xtralis com This page is intentionally left blank...
Страница 284: ...VESDA Pipe Network Design Guide VESDA by Xtralis 40 www xtralis com This page is intentionally left blank...
Страница 290: ...VESDA Pipe Network Design Guide VESDA by Xtralis 46 www xtralis com This page is intentionally left blank...
Страница 292: ...VESDA Pipe Network Design Guide VESDA by Xtralis 48 www xtralis com This page is intentionally left blank...
Страница 293: ...VESDA Pipe Network Installation Guide March 2019 Document 10255_08 Part Number 30008...
Страница 294: ......
Страница 298: ...VESDA Pipe Network Installation Guide VESDA by Xtralis iv www xtralis com This page is intentionally left blank...
Страница 300: ...VESDA Pipe Network Installation Guide VESDA by Xtralis 2 www xtralis com This page is intentionally left blank...
Страница 302: ...VESDA Pipe Network Installation Guide VESDA by Xtralis 4 www xtralis com This page is intentionally left blank...
Страница 304: ...VESDA Pipe Network Installation Guide VESDA by Xtralis 6 www xtralis com This page is intentionally left blank...
Страница 310: ...VESDA Pipe Network Installation Guide VESDA by Xtralis 12 www xtralis com This page is intentionally left blank...
Страница 314: ...VESDA Pipe Network Installation Guide VESDA by Xtralis 16 www xtralis com This page is intentionally left blank...
Страница 328: ...VESDA Pipe Network Installation Guide VESDA by Xtralis 30 www xtralis com This page is intentionally left blank...
Страница 330: ...VESDA Pipe Network Installation Guide VESDA by Xtralis 32 www xtralis com This page is intentionally left blank...
Страница 333: ......
Страница 334: ...VESDA Commissioning Guide December 2012 Document 10195_06 Part Number 30005...
Страница 335: ......
Страница 339: ...VESDA Commissioning Guide VESDA by Xtralis iv www xtralis com This page is intentionally left blank...
Страница 341: ...VESDA Commissioning Guide VESDA by Xtralis 2 www xtralis com This page is intentionally left blank...
Страница 343: ...VESDA Commissioning Guide VESDA by Xtralis 4 www xtralis com This page is intentionally left blank...
Страница 345: ...VESDA Commissioning Guide VESDA by Xtralis 6 www xtralis com This page is intentionally left blank...
Страница 357: ...VESDA Commissioning Guide VESDA by Xtralis 18 www xtralis com This page is intentionally left blank...
Страница 363: ...VESDA Commissioning Guide VESDA by Xtralis 24 www xtralis com This page is intentionally left blank...
Страница 365: ...VESDA Commissioning Guide VESDA by Xtralis 26 www xtralis com This page is intentionally left blank...
Страница 367: ...VESDA Commissioning Guide VESDA by Xtralis 28 www xtralis com This page is intentionally left blank...