Misgav Industrial Park, POB 60, D.N. Misgav 20174, Israel
Tel: +972-4-9951999; Fax: +972-4-9990287
PM0622.07 – Blue Steel CXT3000/CXT4000 CompletePBX Getting Started Guide (electronic version)
Page
1
of
6
Blue Steel CXT3000/CXT4000 CompletePBX:
Getting Started Guide
Package Contents
Blue Steel CXT3000/CXT4000
(2U 19'' width unit)
Power cord
Support hardware for 19'' cabinet
CompletePBX software preinstalled on
the hardware
4 x Astribank power cables
Key for hard disk drive bays
Prerequisites
You need a computer equipped with an Internet browser. Firefox is recommended.
Step 1: Powering Up the Unit
1.
For safety reasons, if the line wiring exits the building, it is essential to ground the unit.
Note: Not properly grounding this device will void your warranty!
a. Connect a grounding tab to the grounding screw on the rear panel.
b. Using 12-16 gauge wire, connect the grounding tab to a reliable ground.
Figure 1: Grounding Screw on
Blue Steel Rear Panel
2.
Connect the unit to the LAN.
3.
Connect the power cord to the device and turn on the power using the power button on the
front panel. The device startup process takes about 2 minutes. The startup time depends on the
number of telephony ports installed in your Blue Steel CXT3000/CXT4000 unit. You will see
the “Loading...” notification on the Liquid Crystal Display (LCD) panel. When the booting
process is near completion, “XORCOM” will appear on the LCD panel.
Step 2: Submit Warranty Activation Request
At this point activate the product warranty (a pre-requisite for submitting any request for
technical support). Go to
https://xorcom.com/xorcom-product-warranty
, complete and submit the
form found there.
Step 3: Configure or Obtain the IP Settings for Blue Steel
CXT3000/CXT4000
It is possible to configure or obtain the IP settings by using either the LCD panel or a keyboard
and a display monitor.
Grounding
Power Supplies
IPMI
Eth1
Eth0
Power for up to
four Astribanks