background image

www.xldisplays.co.uk

01733 511 030

Assembly Instructions

Centro Slatwall

2

Affix upper post to lower post by 
positioning and rotate until assembly drops 

into position, female end centrally over 
male fitting (C), continue rotating 
clockwise through 90º to secure (D).

A

1

B

Place base plate on the floor, position lower post 
centrally over male fitting of base plate (A), and rotate 
until assembly drops into position, continue rotating 
clockwise through 90º to secure (B).

C

D

90º

3

Slot clamps of 750mm 
profile into post channels 
and tighten grub screws 
with hex key supplied to 

secure.

Отзывы: