08/2012
6-103
WorkCentre 5021/5019
6.4.2.13
General Procedures
Initial Issue
6.4.2.13 Tone Up/Down
Purpose
Adjusts the toner density.
NOTE: For more details on the Toner Density Adjustment, refer to [
ADJ 8.1.1
ATC Sensor
Read & Tone Up / Down] in Chapter 4.
6.4.2.13.1 Tone Up
Purpose
During ATC Sensor Read, if the value of [ATC Average Value] is larger than the [ATC Correc-
tion Target Value], it means that the current toner density is lighter than the target value and
hence Tone Up (output of blank paper) will be performed.
NOTE: The difference between [ATC Correction Target Value] and [ATC Average Value] must
be within 30 and the output is equivalent to A4L_7 sheets.
Procedure
1.
Enter the CE Diag Mode and input 923-913 in the Chain-Link.
2.
Pressing the [Start] button transitions to the [ATC Sensor Read] initial screen.
(The same as for ATC Sensor Read)
3.
Pressing the [Start] button displays the animation to indicate that it is in progress.
After the computation has completed, the result for ATC Correction Target Value will be
displayed.
(The same as for ATC Sensor Read)
4.
Pressing the [Original Size] button will display the ATC Average Value and the ATC Cor-
rection Target Value alternately.
5.
Press the [Start] button when the ATC Correction Target Value is displayed with a [triangle
mark] at its heading.
6.
Use the [Reduce / Enlarge] buttons (Up arrow, Down arrow) to set the number of blank
paper to be output (1 to 20 sheets).
7.
You can change the Tray and the Paper Size by pressing the [Paper Supply] and the
[Size] buttons.
NOTE: The Paper Size can be changed by pressing and holding down the [Size] button.
Pressing the [Start] button after the change returns you to the settings screen.
8.
Pressing the [Start] button displays the animation to indicate that it is in progress.
It will count up after each blank paper that is output.
Figure 1 j0lj64012
9.
After the last paper is output or when the [Stop] button is pressed, [End] will be displayed
on the UI.
10. Pressing the [Clear All] button returns you to the [Chain-Link Number Entry] screen.
6.4.2.13.2 Tone Down
Purpose
During ATC Sensor Read, if the value of [ATC Average Value] is smaller than the [ATC Correc-
tion Target Value], it means that the current toner density is darker than the target value and
hence Tone Down (printing of black images) will be performed.
NOTE: The difference between [ATC Correction Target Value] and [ATC Average Value] must
be within 30 and the output is equivalent to A4L_7 sheets.
Procedure
1.
Enter the CE Diag Mode and input 923-914 in the Chain-Link.
2.
Step 2 to Step 5 is the same as for Tone Up
3.
Use the [Reduce / Enlarge] buttons (Up arrow, Down arrow) to set the number of solid
black printouts to be output (1 to 20 sheets).
4.
Pressing the [Start] button displays the animation to indicate that it is in progress.
The machine will output the specified number of solid black printouts to lighten the toner
density.
Содержание WorkCentre 5019
Страница 17: ...08 2012 2 6 WorkCentre 5021 5019 2 1 3 Initial Issue Status Indicator RAPs ...
Страница 19: ...08 2012 2 8 WorkCentre 5021 5019 2 2 1 1 Initial Issue Status Indicator RAPs ...
Страница 21: ...08 2012 2 10 WorkCentre 5021 5019 003 500 795 003 951 Initial Issue Status Indicator RAPs ...
Страница 23: ...08 2012 2 12 WorkCentre 5021 5019 004 345 Initial Issue Status Indicator RAPs ...
Страница 33: ...08 2012 2 22 WorkCentre 5021 5019 023 600 Initial Issue Status Indicator RAPs ...
Страница 35: ...08 2012 2 24 WorkCentre 5021 5019 024 910 911 915 024 950 951 954 Initial Issue Status Indicator RAPs ...
Страница 37: ...08 2012 2 26 WorkCentre 5021 5019 041 210 211 Initial Issue Status Indicator RAPs ...
Страница 39: ...08 2012 2 28 WorkCentre 5021 5019 042 325 614 Initial Issue Status Indicator RAPs ...
Страница 41: ...08 2012 2 30 WorkCentre 5021 5019 045 310 045 313 Initial Issue Status Indicator RAPs ...
Страница 43: ...08 2012 2 32 WorkCentre 5021 5019 061 321 061 325 Initial Issue Status Indicator RAPs ...
Страница 47: ...08 2012 2 36 WorkCentre 5021 5019 071 105 Initial Issue Status Indicator RAPs ...
Страница 51: ...08 2012 2 40 WorkCentre 5021 5019 075 135 Initial Issue Status Indicator RAPs ...
Страница 57: ...08 2012 2 46 WorkCentre 5021 5019 092 660 668 092 910 Initial Issue Status Indicator RAPs ...
Страница 59: ...08 2012 2 48 WorkCentre 5021 5019 093 312 093 912 Initial Issue Status Indicator RAPs ...
Страница 61: ...08 2012 2 50 WorkCentre 5021 5019 095 910 Initial Issue Status Indicator RAPs ...
Страница 63: ...08 2012 2 52 WorkCentre 5021 5019 116 321 116 377 Initial Issue Status Indicator RAPs ...
Страница 65: ...08 2012 2 54 WorkCentre 5021 5019 117 326 Initial Issue Status Indicator RAPs ...
Страница 67: ...08 2012 2 56 WorkCentre 5021 5019 123 314 Initial Issue Status Indicator RAPs ...
Страница 75: ...08 2012 2 64 WorkCentre 5021 5019 2 2 4 8 Initial Issue Status Indicator RAPs ...
Страница 89: ...08 2012 3 14 WorkCentre 5021 5019 IQ15 Initial Issue Image Quality ...
Страница 106: ...08 2012 4 4 WorkCentre 5021 5019 4 1 Initial Issue Disassembly Assembly and Adjustment ...
Страница 116: ...08 2012 4 14 WorkCentre 5021 5019 REP 1 6 1 Initial Issue Repairs and Adjustments ...
Страница 118: ...08 2012 4 16 WorkCentre 5021 5019 REP 2 1 1 Initial Issue Repairs and Adjustments ...
Страница 122: ...08 2012 4 20 WorkCentre 5021 5019 REP 4 1 1 Initial Issue Repairs and Adjustments ...
Страница 124: ...08 2012 4 22 WorkCentre 5021 5019 REP 6 1 1 Initial Issue Repairs and Adjustments ...
Страница 126: ...08 2012 4 24 WorkCentre 5021 5019 REP 7 1 1 Initial Issue Repairs and Adjustments ...
Страница 130: ...08 2012 4 28 WorkCentre 5021 5019 REP 8 2 1 REP 8 2 2 Initial Issue Repairs and Adjustments ...
Страница 162: ...08 2012 4 60 WorkCentre 5021 5019 REP 19 2 1 Initial Issue Repairs and Adjustments ...
Страница 190: ...08 2012 4 88 WorkCentre 5021 5019 ADJ 1 3 2 Initial Issue Repairs and Adjustments ...
Страница 192: ...08 2012 4 90 WorkCentre 5021 5019 ADJ 8 1 1 Initial Issue Repairs and Adjustments ...
Страница 198: ...08 2012 4 96 WorkCentre 5021 5019 ADJ 18 2 2 Initial Issue Repairs and Adjustments ...
Страница 209: ...08 2012 5 6 WorkCentre 5021 5019 5 1 4 5 1 5 Initial Issue Parts List ...
Страница 267: ...08 2012 5 64 WorkCentre 5021 5019 99 8 Initial Issue Parts List ...
Страница 293: ...08 2012 6 24 WorkCentre 5021 5019 6 1 28 6 1 29 Initial Issue General Procedures ...
Страница 295: ...08 2012 6 26 WorkCentre 5021 5019 6 2 1 6 2 2 Initial Issue General Procedures ...
Страница 299: ...08 2012 6 30 WorkCentre 5021 5019 6 3 1 3 Initial Issue General Procedures ...
Страница 303: ...08 2012 6 34 WorkCentre 5021 5019 6 3 2 3 Initial Issue General Procedures ...
Страница 305: ...08 2012 6 36 WorkCentre 5021 5019 6 3 3 Initial Issue General Procedures ...
Страница 317: ...08 2012 6 48 WorkCentre 5021 5019 6 3 6 Initial Issue General Procedures ...
Страница 319: ...08 2012 6 50 WorkCentre 5021 5019 6 3 7 Initial Issue General Procedures ...
Страница 325: ...08 2012 6 56 WorkCentre 5021 5019 6 3 10 Initial Issue General Procedures ...
Страница 327: ...08 2012 6 58 WorkCentre 5021 5019 6 3 11 Initial Issue General Procedures ...
Страница 331: ...08 2012 6 62 WorkCentre 5021 5019 6 3 13 Initial Issue General Procedures ...
Страница 335: ...08 2012 6 66 WorkCentre 5021 5019 6 3 14 Initial Issue General Procedures ...
Страница 337: ...08 2012 6 68 WorkCentre 5021 5019 6 3 15 Initial Issue General Procedures ...
Страница 347: ...08 2012 6 78 WorkCentre 5021 5019 6 3 17 Initial Issue General Procedures ...
Страница 353: ...08 2012 6 84 WorkCentre 5021 5019 6 3 19 Initial Issue General Procedures ...
Страница 355: ...08 2012 6 86 WorkCentre 5021 5019 6 3 20 Initial Issue General Procedures ...
Страница 358: ...08 2012 6 89 WorkCentre 5021 5019 6 4 1 3 General Procedures Initial Issue ...
Страница 359: ...08 2012 6 90 WorkCentre 5021 5019 6 4 1 3 Initial Issue General Procedures ...
Страница 377: ...08 2012 6 108 WorkCentre 5021 5019 6 4 3 Initial Issue General Procedures ...
Страница 393: ...08 2012 7 10 WorkCentre 5021 5019 7 1 2 Initial Issue Wiring Data ...
Страница 394: ...08 2012 7 11 WorkCentre 5021 5019 7 2 1 1 Wiring Data Initial Issue 7 2 1 1 ACH Figure 1 j0yg720101 ...
Страница 395: ...08 2012 7 12 WorkCentre 5021 5019 7 2 1 2 Initial Issue Wiring Data 7 2 1 2 ACN Figure 1 j0yg720102 ...
Страница 396: ...08 2012 7 13 WorkCentre 5021 5019 7 2 1 3 Wiring Data Initial Issue 7 2 1 3 2 5VDC 3 3VDC Figure 1 j0yg720103 ...
Страница 397: ...08 2012 7 14 WorkCentre 5021 5019 7 2 1 4 Initial Issue Wiring Data 7 2 1 4 5VDC 1 Figure 1 j0yg720104 ...
Страница 398: ...08 2012 7 15 WorkCentre 5021 5019 7 2 1 5 Wiring Data Initial Issue 7 2 1 5 5VDC 2 Figure 1 j0yg720105 ...
Страница 399: ...08 2012 7 16 WorkCentre 5021 5019 7 2 1 6 Initial Issue Wiring Data 7 2 1 6 5V RTN 1 Figure 1 j0yg720106 ...
Страница 400: ...08 2012 7 17 WorkCentre 5021 5019 7 2 1 7 Wiring Data Initial Issue 7 2 1 7 5V RTN 2 Figure 1 j0yg720107 ...
Страница 401: ...08 2012 7 18 WorkCentre 5021 5019 7 2 1 8 Initial Issue Wiring Data 7 2 1 8 24VDC 1 Figure 1 j0yg720108 ...
Страница 402: ...08 2012 7 19 WorkCentre 5021 5019 7 2 1 9 Wiring Data Initial Issue 7 2 1 9 24VDC 2 Figure 1 j0yg720109 ...
Страница 403: ...08 2012 7 20 WorkCentre 5021 5019 7 2 1 10 Initial Issue Wiring Data 7 2 1 10 24V RTN Figure 1 j0yg720110 ...
Страница 404: ...08 2012 7 21 WorkCentre 5021 5019 7 2 1 11 Wiring Data Initial Issue 7 2 1 11 IIT 3 3VDC 5VDC 24VDC Figure 1 j0yg720111 ...
Страница 405: ...08 2012 7 22 WorkCentre 5021 5019 7 2 1 12 Initial Issue Wiring Data 7 2 1 12 IIT 3 3V 5V 24V RTN Figure 1 j0yg720112 ...
Страница 406: ...08 2012 7 23 WorkCentre 5021 5019 7 2 56 1 Wiring Data Initial Issue 7 2 56 1 DADF 5VDC Figure 1 j0yg725601 ...
Страница 407: ...08 2012 7 24 WorkCentre 5021 5019 7 2 56 2 Initial Issue Wiring Data 7 2 56 2 DADF 5V RTN Figure 1 j0yg725602 ...
Страница 408: ...08 2012 7 25 WorkCentre 5021 5019 7 2 56 3 Wiring Data Initial Issue 7 2 56 3 DADF 24VDC Figure 1 j0yg725603 ...
Страница 409: ...08 2012 7 26 WorkCentre 5021 5019 7 2 56 4 Initial Issue Wiring Data 7 2 56 4 DADF 24V RTN Figure 1 j0yg725604 ...
Страница 415: ...08 2012 7 32 WorkCentre 5021 5019 4 5 Initial Issue Wiring Data ...
Страница 417: ...08 2012 7 34 WorkCentre 5021 5019 CH1 2 Initial Issue Wiring Data CH1 2 DC Power Generation 5VDC Figure 1 j0yg730102 ...
Страница 418: ...08 2012 7 35 WorkCentre 5021 5019 CH1 3 Wiring Data Initial Issue CH1 3 DC Power Generation 24VDC Figure 1 j0yg730103 ...
Страница 422: ...08 2012 7 39 WorkCentre 5021 5019 CH2 1 Wiring Data Initial Issue CH2 1 Control Panel Figure 1 j0yg730201 ...
Страница 423: ...08 2012 7 40 WorkCentre 5021 5019 CH2 1 Initial Issue Wiring Data ...
Страница 426: ...08 2012 7 43 WorkCentre 5021 5019 CH3 3 Wiring Data Initial Issue CH3 3 Electric Billing Figure 1 j0yg730303 ...
Страница 427: ...08 2012 7 44 WorkCentre 5021 5019 CH3 3 Initial Issue Wiring Data ...
Страница 428: ...08 2012 7 45 WorkCentre 5021 5019 CH4 1 Wiring Data Initial Issue CH4 1 Main Drive Control Figure 1 j0yg730401 ...
Страница 429: ...08 2012 7 46 WorkCentre 5021 5019 CH4 1 Initial Issue Wiring Data ...
Страница 433: ...08 2012 7 50 WorkCentre 5021 5019 CH5 4 Initial Issue Wiring Data CH5 4 Document Feeding Figure 1 j0yg730504 ...
Страница 435: ...08 2012 7 52 WorkCentre 5021 5019 CH5 6 Initial Issue Wiring Data CH5 6 Document Path Figure 1 j0yg730506 ...
Страница 436: ...08 2012 7 53 WorkCentre 5021 5019 CH5 7 Wiring Data Initial Issue CH5 7 Document Transmission Figure 1 j0yg730507 ...
Страница 437: ...08 2012 7 54 WorkCentre 5021 5019 CH5 7 Initial Issue Wiring Data ...
Страница 438: ...08 2012 7 55 WorkCentre 5021 5019 CH6 1 Wiring Data Initial Issue CH6 1 Document Illumination Figure 1 j0yg730601 ...
Страница 439: ...08 2012 7 56 WorkCentre 5021 5019 CH6 2 Initial Issue Wiring Data CH6 2 Carriage Control Figure 1 j0yg730602 ...
Страница 440: ...08 2012 7 57 WorkCentre 5021 5019 CH6 3 Wiring Data Initial Issue CH6 3 Image Input Figure 1 j0yg730603 ...
Страница 441: ...08 2012 7 58 WorkCentre 5021 5019 CH6 4 Initial Issue Wiring Data CH6 4 Laser Control Figure 1 j0yg730604 ...
Страница 442: ...08 2012 7 59 WorkCentre 5021 5019 CH7 1 Wiring Data Initial Issue CH7 1 Tray 2 Sensing 1TM Figure 1 j0yg730701 ...
Страница 443: ...08 2012 7 60 WorkCentre 5021 5019 CH7 2 Initial Issue Wiring Data CH7 2 Tray 1 Paper Stacking Figure 1 j0yg730702 ...
Страница 444: ...08 2012 7 61 WorkCentre 5021 5019 CH7 3 Wiring Data Initial Issue CH7 3 Tray 2 Paper Stacking 1TM Figure 1 j0yg730703 ...
Страница 445: ...08 2012 7 62 WorkCentre 5021 5019 CH7 4 Initial Issue Wiring Data CH7 4 MSI Paper Stacking Figure 1 j0yg730704 ...
Страница 448: ...08 2012 7 65 WorkCentre 5021 5019 CH8 3 Wiring Data Initial Issue CH8 3 Registration Figure 1 j0yg730803 ...
Страница 449: ...08 2012 7 66 WorkCentre 5021 5019 CH8 4 Initial Issue Wiring Data CH8 4 Paper Path Figure 1 j0yg730804 ...
Страница 450: ...08 2012 7 67 WorkCentre 5021 5019 CH9 1 Wiring Data Initial Issue CH9 1 Xero Life Control Figure 1 j0yg730901 ...
Страница 456: ...08 2012 7 73 WorkCentre 5021 5019 CH10 3 Wiring Data Initial Issue CH10 3 Fusing Figure 1 j0yg731003 ...