January 2016
4-4
WorkCentre WorkCentre 4150/4250/4260WorkCentre 4150/4250/42604150/
REP 1.2
Repairs and Adjustments
REP 1.2 Main PWB (4150)
Parts List on
PL 1.10
Removal
NOTE: This procedure should only be performed on the 4150. For the 4250/4260 procedure,
refer to the table of contents.
WARNING
Switch off the electricity to the machine. Disconnect the power cord from the customer
supply while performing tasks that do not need electricity. Electricity can cause death or
injury. Moving parts can cause injury.
WARNING
Take care during this procedure. Sharp edges may be present that can cause injury.
CAUTION
Before performing this procedure, refer to General Disassembly Precautions,
GP 10
.
CAUTION
Ensure that E.S.D. procedures are observed during the removal and installation of the main
PWB. Make a visual check to ensure that the pins are fully inserted, without being damaged.
1.
Power off the machine. Disconnect the power cord.
2.
If a new main PWB is to be installed, go to
GP 3
Machine Status. If possible, print the fol-
lowing reports:
•
System Configuration.
•
Local Address Book Members.
•
Group Address Book Members.
3.
Remove the rear cover,
PL 28.10 Item 6
.
4.
If installed, remove the OSOK,
PL 1.10 Item 26
.
5.
Remove the SIM PWB,
PL 1.10 Item 12
.
6.
If installed, remove the fax PWB module,
PL 1.10 Item 14
.
7.
Remove the infill cover,
PL 1.10 Item 19
.
8.
If installed, remove the following PWBs from the main PWB:
•
Foreign device interface PWB,
PL 1.10 Item 15
.
•
NIC PWB,
PL 1.10 Item 13
.
•
Memory DIMM,
PL 1.10 Item 22
.
9.
Disconnect the HDD PWB,
PL 1.10 Item 17
.
10. Disconnect the CNs from the main PWB.
11.
Remove the main PWB (5 screws).
12. If a new main PWB is to be installed, remove the fax holder,
PL 1.10 Item 24
from the old
main PWB.
13. If a new main PWB is to be installed, remove the MSOK,
PL 1.10 Item 25
from the old
main PWB.
Replacement
1.
Replacement is the reverse of the removal procedure.
2.
If a new main PWB has been installed, perform the following:
a.
Install the fax holder onto the new main PWB.
b.
Install the MSOK onto the main PWB.
c.
Perform
GP 19
Memory Clear.
d.
Use the information on the printed lists to re-enter the customers settings. Refer to
GP 4
System Administration Tools.
Содержание 4150 - WorkCentre B/W Laser
Страница 1: ...January 2016 Xerox WorkCentre 4150 4250 4260 4265 Family Service Manual Updated 1 25 16 DAW...
Страница 3: ...0 0 00 2 No Product Name Assigned Preliminary Working Document Section Name...
Страница 5: ...January 2016 ii WorkCentre WorkCentre 4150 4250 42604150 4250 4260WorkCentre 4150 Introduction...
Страница 63: ...January 2016 1 2 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 Service Call Procedures...
Страница 81: ...January 2016 2 8 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 01A Status Indicator RAPs...
Страница 101: ...January 2016 2 28 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 04 910 Status Indicator RAPs...
Страница 115: ...January 2016 2 42 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 06 100 200 Status Indicator RAPs...
Страница 161: ...January 2016 2 88 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 14 100 Status Indicator RAPs...
Страница 165: ...January 2016 2 92 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 16 100 Status Indicator RAPs...
Страница 169: ...January 2016 2 96 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 17 900 17 910 Status Indicator RAPs...
Страница 179: ...January 2016 3 2 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 Image Quality...
Страница 233: ...January 2016 4 32 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 REP 4 3 Repairs and Adjustments...
Страница 303: ...January 2016 4 102 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 REP 5 33 Repairs and Adjustments...
Страница 327: ...January 2016 4 126 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 REP 7 8 Repairs and Adjustments...
Страница 347: ...January 2016 4 146 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 REP 9 6 Repairs and Adjustments...
Страница 399: ...January 2016 4 198 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 ADJ 1 1 Repairs and Adjustments...
Страница 413: ...January 2016 4 212 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 ADJ 14 4 Repairs and Adjustments...
Страница 415: ...January 2016 WorkCentre 4150 4250 4260WorkCentre 4150 4250 4260 4265WorkCentre Parts List...
Страница 482: ...January 2016 WorkCentre 4150 4250 4260WorkCentre 4150 4250 4260 4265WorkCentre PL 31 10 Parts List...
Страница 483: ...January 2016 WorkCentre 4150 4250 4260WorkCentre 4150 4250 4260 4265WorkCentre PL 31 10 Parts List...
Страница 484: ...January 2016 WorkCentre 4150 4250 4260WorkCentre 4150 4250 4260 4265WorkCentre PL 31 10 Parts List...
Страница 485: ...January 2016 WorkCentre 4150 4250 4260WorkCentre 4150 4250 4260 4265WorkCentre PL 31 10 Parts List...
Страница 487: ...January 2016 6 2 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 General Procedures and Information...
Страница 537: ...January 2016 6 52 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 GP 21 General Procedures and Information...
Страница 563: ...January 2016 7 2 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 Wiring Data...
Страница 627: ...January 2016 8 2 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 Accessories...