24
Truecharge2 Series Battery Charger Owner’s Guide
Installing the Truecharge 2 Battery Charger
Step 5: Powering Up
Make one last check that all connections are correct and secure.
The Truecharge2 Battery Charger charger may now be powered up.
1.
Close the DC disconnect switch or breaker.
2.
Switch the AC power on at the source breaker. It is normal to see a
seven to ten second delay while the charger powers up. During this
time, the indicator LEDs on the onboard display and the remote panel
will illuminate for a second (power on test) before reporting charging
and battery status information.
NOTE:
Battery qualification may not be correctly performed if AC
power is switched on first.
NOTE:
The onboard display LEDs will also illuminate momentarily
with DC power alone when DC power is applied and the minimum
battery voltage (i.e., the connected batteries) is above 9 V.
EXPLOSION AND/OR FIRE HAZARD
The final connection of the DC battery circuit will generate an arc.
Ensure all areas of the system, including batteries and engine
compartments, are well ventilated prior to making this connection.
Failure to follow these instructions will result in death or serious
injury.
TC2 204060 Series BattChg Owners Guide.book Page 24 Friday, July 8, 2011 11:44 AM