Overview of Installation Steps
3–3
❐
Lugs and terminals for the DC cables that connect to the battery and
fuse holder(s)
❐
DC fuse(s) and fuse holder(s)
❐
AC cable (2-conductor-plus-ground cable), sized appropriately for
load and application (if you are connecting to an existing AC circuit)
❐
1/2 inch cable clamp (if connecting to an AC circuit)
❐
AC transfer switch (if connecting to an AC circuit that also uses
power from another AC source)
❐
Appropriately sized copper cable for the chassis ground
❐
Battery isolator (if connecting to a multiple-battery system)
❐
Battery selector switch*
❐
Alternator controller*
❐
High-output alternator*
* Consult
Appendix B, “Battery Types and Sizes”
and
Appendix C,
“Alternators and Charging Systems”
to determine whether you need these
components.
Overview of Installation Steps
Here’s a summary of the seven main steps:
1. Design the installation: calculate battery capacity and charging
requirements.
2. Choose a location.
3. Connect to an AC circuit (if required).
4. Install the remote On/Off switch.
5. Mount the inverter.
6. Connect the chassis ground.
7. Connect the DC cables.
Содержание PROwatt 3000
Страница 1: ...Owner s Guide PROwatt 3000 Inverter...
Страница 6: ...vi...
Страница 10: ...x...
Страница 16: ...1 4...
Страница 42: ...3 18...
Страница 50: ...4 8...
Страница 60: ...B 4...
Страница 70: ...C 10...
Страница 76: ...D 6...
Страница 81: ...Index 5 Index X Xantrex email 2 2 D 2 fax number 2 2 D 2 phone number 2 2 D 2 web site 2 v 4 7 B 3...
Страница 82: ...Index 6...