![XAG P100 Pro Скачать руководство пользователя страница 102](http://html1.mh-extra.com/html/xag/p100-pro/p100-pro_pilot-operating-handbook_3143073102.webp)
XAG AUSTRALIA
102
Install the Battery
To install the battery, insert it into the aircraft's battery compartment. Apply a gentle downward force
until you hear a clicking sound. This audible click confirms that the battery terminal has made a
successful connection with the aircraft.
ℹ
Prior to the battery installation, it is imperative to ensure the power connector of the aircraft
and the battery connector are clean, dry, and devoid of any metal foreign objects or liquids.
This preventive measure is critical to maintaining the overall integrity of your aircraft's electrical
system.
ℹ
Before initiating the power-up sequence, double-check to confirm that the battery is fully
inserted into the battery compartment. Failure to securely position the battery could lead to
unfortunate flight accidents during operation. Therefore, always ensure the battery is properly
installed to guarantee safe and stable flight conditions.
ℹ
IMPORTANT
Содержание P100 Pro
Страница 1: ...XAG P100 Pro Pilot s Operating Handbook EN Version AU V1 0 Type 3WWDZ 50AH...
Страница 2: ......
Страница 26: ...XAG AUSTRALIA 26 Wiring Guide...
Страница 27: ...27 XAG AUSTRALIA...
Страница 61: ...61 XAG AUSTRALIA...
Страница 79: ...79 XAG AUSTRALIA 01 02 03 04 05 XAG One APP User Interface APP UI Accounts Menu...
Страница 85: ...85 XAG AUSTRALIA 13 14 15 16 17 18 19 12 11 08 09 10 07 01 02 03 04 05 06 APP UI Operation In Flight...
Страница 140: ...XAG AUSTRALIA 140 04 Choose Autonomous Operation from the menu then close it to return to the Operation View screen...