Xtreme Power Conversion Corporation
TX90 6kVA & 10kVA User’s Manual
Page 38
Uninterruptible Power Supply
Installation And Operation
Note:
The packing condition and the external outlook of the unit should be inspected carefully before installation.
Retain the packing material for future use.
Unpacking
• Take the battery bank out of the PE foam.
• Remove the packing materials.
• Note: The battery bank module is approx. 120 kgs, be cautious when unpacking and lifting the unit to avoid
injury.
• Standard Package includes:
o User’s Manual
o DC connection cable.
o A pair of kits to fix DC connect cable.
o The casters cover kits.
Selecting Installation Position
It is necessary to select a proper environment to install the unit, in order to minimize the possibility of damage to
the battery bank and extend the life of the batteries. Please follow the instructions below:
1.
Keep at least 8 inches clearance from the rear panel of the battery bank from the wall or other obstruc
-
tions.
2.
Do not block the air-flow to the ventilation openings of the unit.
3. Please ensure the installation site environmental conditions are in accordance with the battery bank work
-
ing specifications to avoid overheat and excessive moisture.
4. Do not place the battery bank in a dusty or corrosive environment or near any flammable objects.
5.
This battery bank is not designed for outdoor use.