Страница 3: ...n sliding the rear post vertically until the next adjustment hole is visible through the hole in which the bolt was removed Fasten all triangles at desired tilt angle Framed Modules portrait Framed Mo...
Страница 4: ...bject to technical changes Copyright 2009 HatiCon Solar LLC Page Assembly sequence of the flat roof First the angle brackets must be assembled b fastening T Bolt nut and washer Hardware m remain loose...
Страница 5: ...of 11 Installing Triangles Triangles can now be mounted to base rails To do this properly space triangles on the base rail per the structural site specific drawings and attach with cross adapters A to...
Страница 6: ...6 1 One of these is mounted for each completed row and at least one for every 40 ft The diagonal straps are fastened to the rear triangle struts using T Bolts See Figure 6 2 Torque 6 to 8 ft lbs Insta...
Страница 7: ...s Clamps should be attached of the way down from the edge of the module See Figure 9 2 Then slide the module into the thin film end clamp and tighten the T Bolts clockwise Torque 6 to 8 ft lbs Next sl...
Страница 8: ...g instructions reflect the state of technology and our experience on how to install our systems on site Due to the fact that each roof has individual characteristics we highly recommend commissioning...
Страница 9: ...can be attached using a splice To install simply insert the splice into the end of the rail that will need to be joined until the rivet on the middle of the splice stops the insertion Then slide the o...
Страница 10: ...click the mid clamp onto the mounting rail an slide it onto the module Ensure that the mid clam clicks onto both sides of the mounting rail See Figure 4 2 Now slide the next module under the mid clam...
Страница 11: ...the horizontal substrate rails for each row of modules using the cross adapters Click the cross adapters onto the base rails and slide attachment lip into channel on base rail Fasten the clamp screws...
Страница 12: ...uring installation If a concrete foundation is prepared the sinking of the sigma posts with rebar requires a reinforced foundation A hole must be drilled within 8 inches of the bottom of the sigma pos...
Страница 13: ...nges Copyright 2009 HatiCon Solar LLC Page 3 of 8 The previously assembled bearing block and vertical post assembly from step 3 are inserted into the sigma posts with the short vertical posts serving...
Страница 14: ...ardware ST AK 120 90 Mounting Rail ST AK 120 90 Splice ST AK 60 37 Mounting Rail ST AK 60 37 Splice ST AK 66 37 Mounting Rail ST AK 66 37 Splice The designs are based on the following codes 2006 Inter...
Страница 15: ...side of bearing block must face thin side of vertical post profile to maintain structural Integrity See Figures 3 1 and 3 2 Nut and washer must be fastened on the thick side of the vertical post extru...
Страница 16: ...est axis See Figure 5 1 5 2 The T Bolts must be turned 45 clockwise until they cannot be turned any further See Figure 5 2 A line on the bottom of the T bolts shows proper alignment Line must be perpe...
Страница 17: ...ils and slide attachment lip into channel of base rail on either side See Figures 7 1 7 2 Fasten the clamp screws by turning clockwise Torque to 6 to 8 ft Lbs ST AK 60 37 7 1 7 2 Fig 8 1 Fig 8 2 Subje...
Страница 18: ...f a column of landscape oriented modules See Figure 10 3 Once the module is mounted click the mid clamp onto the module rail and slide the clamp onto the module frame See Figure 10 4 10 4 10 3 Adjusta...