
Operation
64
3 Insert the 1000 NTU/FNU calibration standard in the
cuvette shaft so that it clicks into place.
4 Press the
1
key and align the cuvette as
described on page 55.
After releasing the
1
key a 30 seconds
countdown is displayed. The instrument measures
the calibration standard and afterwards shortly
displays the 1000. Then the prompt to insert the
second calibration standard is displayed:
5 Insert the 10.0 NTU/FNU calibration standard in the
cuvette shaft so that it clicks into place.
6 Press the
1
key and align the cuvette as
described on page 55.
After releasing the
1
key a 60 seconds
countdown is displayed. The instrument measures
the calibration standard and afterwards shortly
displays the 10.0. Then the prompt to insert the third
calibration standard is displayed:
1
3
2
1
ERR
4
1 0 0
NTU
FNU
CAL
Содержание Turb 355 IR/T
Страница 1: ...Turb 355 IR T ba75454e03 09 2010 41 Operating Manual Portable turbidimeter...
Страница 4: ...Inhaltsverzeichnis 44...
Страница 8: ...Overview 48...
Страница 12: ...Safety 52...
Страница 28: ...Operation 68...
Страница 38: ...Accessories Options 78...
Страница 42: ......
Страница 43: ......