
Commissioning
pH/ION 7320
12
ba75935e04
12/2017
3.3.1 Inserting the batteries
You can operate the meter either with normal batteries or with
rechargeable batteries (Ni-MH). In order to charge the batteries, an
external charging device is required.
1 Battery compartment
1.
Open the battery compartment (1) on the underside of the meter.
CAUTION
Make sure that the poles of the batteries are positioned cor-
rectly.
The ± signs on the batteries must correspond to the
±
signs in
the battery compartment.
2.
Place four batteries (type Mignon AA) in the battery compartment.
3.
Close the battery compartment (1).
4.
Set the date and time
(see section 5.4.6 E
1
Содержание pH/ION 7320
Страница 2: ...2 ba75935e04 12 2017 pH ION 7320 Copyright 2017 Xylem Analytics Germany GmbH Printed in Germany ...
Страница 6: ...Contents pH ION 7320 6 ba75935e04 12 2017 ...
Страница 86: ...Transmitting data USB interface pH ION 7320 86 ba75935e04 12 2017 ...
Страница 92: ...What to do if pH ION 7320 92 ba75935e04 12 2017 ...
Страница 103: ......