
Installation
System 2020 XT C
ONNECT
3 - 20
ba75970e01
10/2012
Stacking the
MIQ modules
Fig. 3-12
Stacking the
MIQ modules (variant 2)
Fig. 3-13 Closing the housing (variant 2)
7
Attach the prepared MIQ module to the back of the front
MIQ module. At the same time, ensure that the two clips on the
front MIQ module click into place in the lid of the back
MIQ module. Subsequently, tighten the two screws (pos. 8 in
8
Check the position of the SN terminator switch and correct it if
necessary (see section 3.10.1).
5
Содержание IQ SENSOR NET System 2020 XT
Страница 2: ...Copyright 2016 Xylem Analytics Germany GmbH Printed in Germany...
Страница 8: ...Contents System 2020 XT CONNECT 0 6 ba75970e01 10 2012...
Страница 24: ...Overview System 2020 XT CONNECT 1 16 ba75970e01 10 2012...
Страница 28: ...Safety System 2020 XT CONNECT 2 4 ba75970e01 10 2012...
Страница 123: ...System 2020 XT CONNECT Settings setup 5 11 ba75970e01 10 2012 Fig 5 10 Edit list of sensors...
Страница 138: ...Settings setup System 2020 XT CONNECT 5 26 ba75970e01 10 2012...
Страница 152: ...Network connection System 2020 XT CONNECT 6 14 ba75970e01 10 2012...
Страница 178: ...PROFIBUS connection option System 2020 XT CONNECT 8 12 ba75970e01 10 2012...
Страница 180: ...Maintenance and cleaning System 2020 XT CONNECT 9 2 ba75970e01 10 2012...
Страница 194: ...What to do if System 2020 XT CONNECT 10 14 ba75970e01 10 2012...
Страница 204: ...Accessories and options System 2020 XT CONNECT 12 2 ba75970e01 10 2012...
Страница 211: ...Lists IQ SENSOR NET System 2020 XT CONNECT 13 7 ba75970e01 10 2012 W Weekly load diagram of selected sensor 4 19...
Страница 212: ...Lists IQ SENSOR NET System 2020 XT CONNECT 13 8 ba75970e01 10 2012...
Страница 215: ......