Installation
System 2020 XT C
ONNECT
3 - 2
ba75970e01
10/2012
3.3
Basics of the installation
3.3.1 System planning
Overview of planning
steps
Fig. 3-1 System planning
- Sum of all line lengths max. 1000 m
- Of these, max. 500 m branch lines
altogether
- Single branch line max. 250 m
Total line lengths of > 1000 m
can be realized with the
signal amplifier module
MIQ/JBR
Total line lengths < 400 m
not have to be taken into account
do
More power required due to cable losses:
From
1 watt per
100 m additional line length.
400 m total line length
- Position power supply modules near
main consumers (e. g. UV/VIS sensor)
- Further power supply module or adjust-
ment of infrastructure if necessary.
Power requirement =
S
P of all consumers
- Number and types of required sensors
- Measuring locations to be designed
- Number of required operating locations
- Distances
- Infrastructure, process environment etc.
Rough planning
Rough determination of power requirement
Consideration of cable losses
Rating
Fine adjustment
IQ
to layout
S
ENSOR
N
ET
Power requirement of components
Total power requirement
Number of power supply modules
required
Fundamentals of planning
Start
End
S
P of all power supply modules >
total power requirement
Arrangement of
power supply modules
Содержание IQ SENSOR NET System 2020 XT
Страница 2: ...Copyright 2016 Xylem Analytics Germany GmbH Printed in Germany...
Страница 8: ...Contents System 2020 XT CONNECT 0 6 ba75970e01 10 2012...
Страница 24: ...Overview System 2020 XT CONNECT 1 16 ba75970e01 10 2012...
Страница 28: ...Safety System 2020 XT CONNECT 2 4 ba75970e01 10 2012...
Страница 123: ...System 2020 XT CONNECT Settings setup 5 11 ba75970e01 10 2012 Fig 5 10 Edit list of sensors...
Страница 138: ...Settings setup System 2020 XT CONNECT 5 26 ba75970e01 10 2012...
Страница 152: ...Network connection System 2020 XT CONNECT 6 14 ba75970e01 10 2012...
Страница 178: ...PROFIBUS connection option System 2020 XT CONNECT 8 12 ba75970e01 10 2012...
Страница 180: ...Maintenance and cleaning System 2020 XT CONNECT 9 2 ba75970e01 10 2012...
Страница 194: ...What to do if System 2020 XT CONNECT 10 14 ba75970e01 10 2012...
Страница 204: ...Accessories and options System 2020 XT CONNECT 12 2 ba75970e01 10 2012...
Страница 211: ...Lists IQ SENSOR NET System 2020 XT CONNECT 13 7 ba75970e01 10 2012 W Weekly load diagram of selected sensor 4 19...
Страница 212: ...Lists IQ SENSOR NET System 2020 XT CONNECT 13 8 ba75970e01 10 2012...
Страница 215: ......