
Installation
System 2020 XT C
ONNECT
3 - 16
ba75970e01
10/2012
Premounting the ISO blind
nuts
Fig. 3-6 Premounting the ISO blind nuts (variant 1)
4
Attach the contact base (pos. 5 in Fig. 3-5) on the front
MIQ module with the two plastic tapping screws (pos. 6).
5
On the front MIQ module, remove the two countersunk screws
(pos. 7 in Fig. 3-5) and swing open the module lid.
6
Insert the cheese-head screws (pos. 8 in Fig. 3-6) with the
plastic washers in the drilled mounting holes in the enclosure
and loosely screw in the ISO blind nuts (pos. 9).
9
8
Содержание IQ SENSOR NET System 2020 XT
Страница 2: ...Copyright 2016 Xylem Analytics Germany GmbH Printed in Germany...
Страница 8: ...Contents System 2020 XT CONNECT 0 6 ba75970e01 10 2012...
Страница 24: ...Overview System 2020 XT CONNECT 1 16 ba75970e01 10 2012...
Страница 28: ...Safety System 2020 XT CONNECT 2 4 ba75970e01 10 2012...
Страница 123: ...System 2020 XT CONNECT Settings setup 5 11 ba75970e01 10 2012 Fig 5 10 Edit list of sensors...
Страница 138: ...Settings setup System 2020 XT CONNECT 5 26 ba75970e01 10 2012...
Страница 152: ...Network connection System 2020 XT CONNECT 6 14 ba75970e01 10 2012...
Страница 178: ...PROFIBUS connection option System 2020 XT CONNECT 8 12 ba75970e01 10 2012...
Страница 180: ...Maintenance and cleaning System 2020 XT CONNECT 9 2 ba75970e01 10 2012...
Страница 194: ...What to do if System 2020 XT CONNECT 10 14 ba75970e01 10 2012...
Страница 204: ...Accessories and options System 2020 XT CONNECT 12 2 ba75970e01 10 2012...
Страница 211: ...Lists IQ SENSOR NET System 2020 XT CONNECT 13 7 ba75970e01 10 2012 W Weekly load diagram of selected sensor 4 19...
Страница 212: ...Lists IQ SENSOR NET System 2020 XT CONNECT 13 8 ba75970e01 10 2012...
Страница 215: ......