Commissioning
Cond 3310 IDS
12
ba77051e04
07/2017
3
Commissioning
3.1
Scope of delivery
Meter Cond 3310 IDS
4 batteries 1.5 V Mignon type AA
USB cable (A plug on mini B plug)
Short instructions
CD-ROM with
– USB drivers
– detailed operating manual
– Software MultiLab Importer
3.2
Power supply
The Cond 3310 IDS is supplied with power in the following ways:
Battery operation (4 batteries, 1.5 V Mignon type AA)
USB operation via a connected USB-B cable
3.3
Initial commissioning
Perform the following activities:
Insert the supplied batteries
Switch on the meter (see
section 4.2 S
Set the date and time (see
section 4.4.5 E