Original Operating Instructions
BATD0050-ES-1-400-1
Installation
O_BATD0050-ES-1-400-1_V2.6_GB
Page
39
of
72
Figure 19: Connection supply voltage and PLC
Output signal Connections Description
Values
Feedback On
(-X11.1)
DC links are connected 24 V
DC
, max. 10 mA
Feedback Off
(-X11.2)
DC links are
disconnected
24 V
DC
, max. 10 mA
Feedback Trip (-X11.3)
Circuit breaker tripped
24 V
DC
, max. 10 mA
Feedback EN
(-X11.6)
Enable signal
24 V
DC
, max. 5 mA
Input signal
Connections Description
Set values:
Control On
(-X11.4)
Connect DC links
24 V
DC
, min. 20ms, input
resistance: 93 k
Ω
Control Off
(-X11.5)
Disconnect DC links
24 V
DC
, min. 20ms, input
resistance: 93 k
Ω
Programming PLC:
The positive edge of the
“Control On” input signal on the terminal (-X11.4) connects the
DC links between the product and SBB16-10. The positive edge of the
“Control Off”
input signal on the terminal (-X11.5) disconnects the DC links between the product and
SBB16-10.
The
“Control On” and “Control Off” signals must be inverted to each other.
NOTICE: The DC links may only be connected if the signal
“Feedback EN” is
present.
Содержание BATD0050-ES-1-400-1
Страница 72: ......