Original Operating Instructions
BATx0100-ES-1-400-1
Commissioning
O_BATx0100-ES-1-400-1_V3.1_GB
Page
48
of
73
4.2
Performing Measurements before Operation
WARNING!
Risk of injury due to high voltage when measuring!
Improper measurements at high voltage can cause injury.
•
Perform measurements only with appropriate measurement
devices.
•
During measurement, all circuit breakers must be switched in
position
OFF
and all fuses must be removed.
•
The product must only be started by persons who have all skills
described in Section Target Audience.
NOTICE
Damage to measuring device due to overvoltage!
Measurements with the incorrect measuring range can cause damages.
•
Use only measuring devices with the correct measuring range.