MRTA8-DC3: #35121AUS
Rev 5.0/2-21
26
T
O
T
ILT
THE
L
OAD
Keep hands and fingers away
from tilt linkage.
1)
2A
3A
3B
Make sure the load has
enough clearance to tilt
without contacting anyone or
anything.
2) Use the control handle (circled
in fig. 2A) to keep the load
under control at all times.
3) Make sure the tilt locks
(circled in fig. 3A) are
disengaged as previously
directed, and lift upward or
press downward on the
control handle to tilt the load
as required.
1
Note: See
about
allowable load overhang.
Note: A load with overhang
may force you to release the
control handle as the load
approaches the flat position.
In this case, use hand cups
(circled in fig. 3B) or other
appropriate means to control
the load.
1..... Due to the tilt linkage design, load force on the control handle changes direction during the tilt.
OPERATION
Содержание QUADRA-TILT MRTA810CDC3O
Страница 2: ...MRTA8 DC3 35121AUS Rev 5 0 2 21 2...
Страница 6: ...MRTA8 DC3 35121AUS Rev 5 0 2 21 4 Note A standard MRTA811LDC3 is shown SPECIFICATIONS...
Страница 11: ...Rev 5 0 2 21 MRTA8 DC3 35121AUS 9 TO CHANGE THE PAD FRAME CONFIGURATION ASSEMBLY...
Страница 47: ...Rev 5 0 2 21 MRTA8 DC3 35121AUS 49...
Страница 48: ...MRTA8 DC3 35121AUS Rev 5 0 2 21 50...