TST-019 MRTALPCH CHANNEL
– Rev. 2016-310
Page 11 of 20
30) If, in step 14, the indication was that
the hose connection to the vacuum
tanks leak, proceed as follows.
The hose runs from the solenoid valve
and through the slot to the outer surface
of the channel, where it is split with a
Y-fitting to provide a connection to each
vacuum tank; the hoses are guarded by
the hose cover shown in
FIGURE 13
. If
the cover is still attached, remove the two 1/4-20 bolts (
13A
) securing the cover to the channel
in order to access the hoses and fittings.
31) The components involved will be the hose running from the 45° fitting of the pump solenoid
(
14A
) to the Y-fitting (
14B)
and the green and red hoses (
14C
) running from the Y-fitting to their
respective vacuum tank connection. See
FIGURE 14
.
32)
Check the connection of the 3/8" O.D. red (
15A
) and green (
15B
) hose to the push-in fitting of
the vacuum tanks, shown in
FIGURE 15
. Cut approximately 1/8" [3 mm] from the end of each
hose, taking care to keep the cuts square and straight, and reattach them to the vacuum tanks.
33) Repeat the vacuum test (steps 12 through 14) shown in
FIGURE 7
.
14A
14B
14C
FIGURE 14
NOTE: THE GRAPHIC ABOVE WAS SPLIT TO BETTER SHOW THE LOCATIONS OF THE PARTS DISCUSSED
FIGURE 13
13A
FIGURE 15
15A
15B