1
8
11
10
9
12
13
2
3
4
5
Nut
M6*14 screw 8PCS
M6*12 screw 4PCS
M6*14 screw 8PCS
beam 1
beam 2
up
Assembly Instructions
Parts and Tools list
8
9
7
6
5
4
3
2
1
10
NO.
11
12
13
NO.
1
Qty
Qty
Name
Name
2
2
Bracket
Feet
M6*14 Screw
16
Driveshaft
1set
Lifting System
1set
8
M6*10 Screw
1
Rubber Cushion
M6*12 Screw
8
6
Spanner
2
1
8
4mm Hex Spanner
Rubber Cushion 6PCS
M6*12 screw 4PCS
M6*10 screw
Loosen the 4pcs M6*10 screws on the beam with a 4mm hex spanner and extend the beam.
M6*10 screw
Fix the foot on the lifting leg with 8pcs M6*14 screws.
Overturn frame and fix the brackets to beam using 4 of M6*12 screws,and then fit the rubber
cushions to the brackets and beams.
Loosen the nut on the transmission rod with a wrench, pull out the hexagon rod inside the transmission rod (be careful not to pull out one end with slot), install one end of the transmission rod with nut on the
hexagon rod of the main leg, insert the hexagon rod into the gear box of the secondary leg, and finally lock the two nuts on the transmission rod.
With motor
To leg WITHOUT motor
To leg WITH motor
down
Support Beam
2
3
4
5
1 6 7
ST3.5*16 Screw
ST4.8*16 Screw
After extending the beam, beam 2 should NOT
block the holes of beam 1, in order to be easy fixing screws.
Fix the lifting leg to the beam with 8 pcs M6*14 screws and 4pcs M6*12 screws, shorten the beam to the mect desktop's size and fix the beam with 8pcs M6*10 screws.(4pcs M6*10 screws in the screw bag)