P1-DC3: #35123
Rev 5.2/12-21
26
Perform the following tests before placing the lifter in service
initially
and
following any repair
,
when directed in the
, or
whenever necessary:
Operational Tests
Test all features and functions of the lifter (see “OPERATING FEATURES” and “OPERATION”).
Vacuum Test
1) Clean the face of each vacuum pad (see
).
2) Use a test load with weight equal to the Maximum Load Capacity, a clean, smooth,
nonporous surface and other appropriate
1
3) Attach the lifter to the test load as previously directed. After the vacuum pump stops
running, the vacuum level should appear in the green range on each of the vacuum
gauges.
4)
Take precautions in case
load should fall during test.
Raise the load a minimal distance. Then hold the
“function” button (
) and the “power” button
(
) for at least 5 seconds to power down the
lifter.
2
5) Watch the vacuum gauges:
The vacuum level should not decrease by more than 4" Hg
[-14 kPa] in 5 minutes.
6)
Never use lifter that has
failed test.
Lower the load after 5 minutes or whenever a
lifter fails the test, and release the load as
previously directed.
7)
This service must be performed
by qualified service personnel.
Qualified service personnel must correct any
fault in the vacuum system before the lifter
can be returned to service.
1..... The load should have either a flat surface or no more curvature than the lifter is designed for, if any.
2..... During this time, the LCD screen displays “WARNING: Is load attached?”, the notification buzzer chirps and the strobe light flashes.
INSPECTIONS AND TESTS
Содержание 98720
Страница 2: ...P1 DC3 35123 Rev 5 2 12 21 2 ...
Страница 6: ...P1 DC3 35123 Rev 5 2 12 21 4 SPECIFICATIONS Note A standard P11104DC3 is shown ...
Страница 42: ...P1 DC3 35123 Rev 5 2 12 21 40 ...
Страница 43: ...Rev 5 2 12 21 P1 DC3 35123 41 ...